Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Thrust Bearing - Clean and repack 1/2 to 3/4 Full with Mobilux EP2 (Due Quarterly)
-
Barrel Cooling Unit - Replace Fluid using U-Con 50HB-280X (Due Quarterly)
-
Drive Motor - 2 to 3 pumps of grease on each fitting with Mobilux EP2 (Due Quarterly)
-
Cooling Bed - Check gearbox fluid level and add if needed with Mobilgear 630 or DTE Oil BB (Due Quarterly)
-
Temp Controls - Check and recalibrate (Due Yearly)
-
Reducer Gear Box - Drain, flush and refill with Mobilgear 630 or DTE Oil BB (Due Yearly)
-
Hydraulic Oil - Remove oil, thoroughly clean and flush tank. Replace oil with Mobil DTE 26 (Due Yearly)
-
Barrel Cooling Unit - Remove fluid, clean and flush tank and lines. Replace with U-Con 50 HB-280X (Due Yearly)
-
Trimmer - Remove fluid, clean and flush gearbox and replace oil with Mobilgear 630 or DTE Oil BB (Due Yearly)