Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Starting Up Room

  • Turn Heats on All Blow Mold Machines (should be done 2 hours before starting)

  • Turn Chiller On (we have liquid cooled barrels on BM3,4,5 and the coolant temp is controlled by the chiller) if not we wouldn't turn on chiller until we turned on hydraulic system

  • Check all Scrap Bags and Trash Cans (on floor and grinding rooms) and remove any full ones

  • Replace any Bags of Scrap or Trash with New Empty Bags

  • Empty Regrind Bins of Any Plastic Trim and Scrap

  • Wipe Down and Sanitize Regrind Bins

  • Sweep/Clean Regrind Rooms

  • Check Scrap Barrels in Regrind Rooms, Replace if they're Full

  • Remove Oil Soaked Pads from Around/Under Extruder and Hydraulic Motors on All Machines

  • Inspect and Change 10X10 Blow Off Filter, if necessary

  • Inspect and Change 20X20 Scrap Chute Filter, if necessary

  • Remove all Bottles and Plastic Under Machines, On Cooling Beds and In Trimmer

  • Replace all direct air filters (round one's with at least one filter) for LD, Blow Off, and Blow Off Assist (this is also done daily)

  • When ready to start machines - turn on grinder blower, grinder, vacuum pump, V/R Bin

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.