Title Page
-
Store Number and Name
-
Store Address
-
Opening Hours
-
RDC Region
-
Survey Completed by
-
Survey Completed on
BUF Room
-
Internal Dimensions of the room (Width x Depth x Height)
-
One door or two door room?
-
Modular or Concrete floor?
-
What type of lighting does it have? LED or other?
-
Does the lighting work off an IR sensor?
-
Does the lighting have emergency lighting included?
-
Is there a test switch visible for the emergency lighting test?
-
Is there a PRV fitted to the room and does it look like its in working order?
-
What type of door switch is fitted
-
Does the door open alarm (Sounder and Beacon) work?
-
What type of Trapped Man alarm is fitted
-
Does the trapped man alarm button work (Test)
-
Is there an EBRO temperature logger installed within the room?
-
Can you see a temperature displayed on the underfloor heating controller?
-
Does the top of the coldroom have rubbish stored on it?
-
What is the gap between the top of the coldroom and the underside of the ceiling?
-
What is the ceiling above the coldroom made off?
-
What is the gap between the false ceiling and next level up?
-
Is there a ventilation system on top of the room and will it be in the way
-
Is there an accesible loft space within the store and above the BUF area
-
What route does the drain use to exit the coldroom?
-
Is the external drain accessible?
-
Where does the drain terminate?
-
Where does the refigeration pipework exit the room?
-
Any obvious fabric damage to the room or the door?
-
Can you identify the coldroom panel manufacture?
- No
- Viessmann
- Kramer
- Celltherm
- Kingspan
- Other
-
What is the void gaps between the coldroom and the walls? Identify for each aspect
-
Is the mains power isolator located by the coldroom? If so where?
-
Any other comments re access for Monoblocks
Connection to existing services
-
How far from the coldroom is it to get to a section of DN65 pipework
-
What is the route like from the coldroom to the connection point
-
How far away is the refrigeration distribution board?
-
Is there enough spare ways to connect for the Monoblocks (Typically 2 x 16A TP&N) but could be three depending upon room size
-
Does the existing Hauser installation drawing show the correct pipework route?
-
If not then mark up the correct route
Existing External plant
-
Mark up the external plant location and service run route on the supplied visio
-
Any access issues to get to the current plant location to enable it to be removed?
-
What sort of specialist access / removal equipment would be needed?
General Aspect Photos
-
Take a number of general aspect photos
-
Any other general observations