Information

  • Title

  • Address of the Premises
  • Responsible Person

  • Competent Person

  • Date of Fire Risk Assessment

  • Enter date of previous Fire Risk Assessment

  • Suggested Date for Review (earlier review may be necessary)

  • Conducted on

The Fire Risk Assessment

Introduction & Applicable Fire Safety Legislation

  • The Fire Risk Assessment is based on areas that were accessible at the time of the F.R.A. This Fire Risk Assessment has been undertaken in accordance with the following legislation & guidance (including CPUK Group Policies & Procedures);

Part 1: GENERAL INFORMATION

1 The Premises

  • Name of The Responsible Person.

  • Name of The Competent Person.

  • Number of Floors.

  • Floor Area: (m2 per floor)

  • Floor Area: (m2 total)

  • Brief details of Construction

  • Is this a project under construction or is this a finished building (add details below).

  • Occupancy type ( Construction Site/Re-furbishment Project/Finished Building/Project).

2 The Occupants

  • Maximum number of CPUK staff at any given time:

  • List All Sub-Contractors currently on site and allocate them a Risk Ranking of Low, Medium or High.

  • List All Foreseeable Sub- Contractors and allocate them a Risk Ranking of Low, Medium or High.

  • Maximum number of Sub-Contractors on site at any given time:

  • Maximum number of members of the public at any given time:

  • Overall Maximum number of occupants at any given time:

3 Occupants At Special Risk

  • Are young persons employed at the premises?

  • Are there any sleeping occupants at the premises?

  • Are there disabled occupants?

  • Are there lone workers?

  • Are there occupants in remote areas?

  • Are there occupants whose first language is not english, are there adequate controls in place?

  • Based on the above is there a need to develop a P.E.E.P. (Personal Emergency Evacuation Plan)?

4 Previous Fire Loss Experience

  • Is there any previous history of fire loss in the premises

5 Other Relevant Background Information.

  • Is there adequate protection of any other properties attached to or adjacent to the Construction Site/Building?

  • Is there a prohibition notice in place (Fire Service)?

  • Is there an alteration notice in place (Fire Service)?

  • Is there an enforcement notice in place (Fire Service)?

  • Details of any other relevant information

Part 2: FIRE HAZARDS AND ELIMINATION OR CONTROL

6 Electrical Sources of Ignition & Control Measures

  • Is the fixed wiring installation periodically tested and inspected (wiring for site cabins = 12 monthly test from supplier. 5 year test certificate for Head Office).

  • Is the supply/feed for site cabins tested at 3 monthly intervals?

  • Is there a suitable policy about the use of personal electrical appliances?

  • Are portable appliances tested/inspected (P.A.T. Testing)?

  • Is there a suitable limitation on the use of trailing leads and adapters?

  • Is task lighting compliant with company standards?

7 Smoking/Vaping (E-cigarrettes).

  • Are reasonable measures taken to prevent fires as a result of smoking/vaping?

  • Is smoking/vaping prohibited on the Construction Site & or in the building?

  • Is smoking/vaping prohibited other than in appropriately designated areas?

  • Are there suitable arrangements made for those who wish to smoke/vape?

  • Is there absence of any evidence of breaches of smoking/vaping policy?

  • Is the appropriate smoking/vaping prohibition notice displayed at the site cabins & building's entrance?

8 Arson

  • Does the basic security against arson appear reasonable?

  • Is there sufficient control of unnecessary fire load in close proximity to the building or available for ignition by outsiders?

  • Waste Skips - to be placed in a suitably designated area (away from site perimiter, wherever possible away from the building/structure. Covered lockable skips are to used where required for example in city centres and where the 2 previous points cannot be satisfied).

9 Portable Heaters & Heating Installation

  • Is the use of portable heaters avoided as far as reasonably practicable?

  • If portable heaters are used, are the more hazardous types (radiant bars and LPG) avoided?

  • Where radiant bars or LPG Heaters are permitted to be used is SP 018 being adhered to (Hot Works Permit in place)?

  • If portable heaters are used are suitable measures taken to minimise the risk of ignition of combustible materials?

  • Are fixed heating installations subject to regular maintenance?

10 Means of Heating Food/Boiling Water? (Welfare Facilities).

  • Are reasonable measures taken to prevent cooking fires?

  • Is suitable fire fighting equipment available?

11 Lightning

  • Does the Construction Site/ Building have lightning protection system if required?

12 Other Significant Ignition Sources that warrant consideration

  • List other Ignition Sources:

13 Housekeeping/Waste

  • Is the standard of housekeeping adequate (clean as you go policy adopted by all trades)?

  • Are combustible materials separated from ignition sources?

  • Is the unnecessary accumulation of combustibles and waste avoided?

  • Is there appropriate storage of hazardous materials?

  • Are combustible materials stored appropriately?

14 Hazards Introduced by Contractors & Building Works

  • Consider High Risk Contractors: Is there sufficient control over works by contractors (e.g. Permits to work & hot works permits)? List the Sub-Contractors affected by the Hot Works Procedure.

  • As part of the work process are there arrangements for the safe storage of gas bottles, flammable liquids, fuels, and others hazardous materials

  • Are fire safety conditions and instructions communicated to contractors?

15 Other Dangerous Substances (not previously mentioned example- Nuclear, Biological, Chemical, Radiation).

  • If dangerous substances are present on the premises have adequate measures bee taken to eliminate or reduce the risk to relevant persons?

Part 3: FIRE PROTECTION MEASURES

16 Means of Escape

  • Is the building provided with adequate means of escape in case of fire (Both Horizontally & Vertically)?

  • Are there sufficient exits?

  • Are exits easily and immediately openable where necessary?

  • Do fire exits open in the direction of travel where necessary?

  • Have sliding or revolving doors been avoided as fire exits?

  • Are there adequate means of securing exits?

  • Are there reasonable distances of travel where there is a single direction of travel (18 Metres)?

  • Are there reasonable distances of travel where there are alternative means of escape (45 Metres)?

  • Are horizontal (corridoors) & vertical (stairwells) escape routes adequately protected?

  • Are there suitable fire precautions for all inner rooms?

  • Are there suitable means of escape for disabled occupants?

  • Are escape routes unobstructed?

17 Measures to Limit Fire Spread & Development (finished building).

  • Are fire doors to appropriate fire resisting standards?

  • Is there a sufficient standard of compartmentation and sub-compartmentation?

  • Are linings that promote fire spread avoided as far as reasonably practicable?

18 Fire Doors

  • Are temporary fire doors fitted (construction sites only)?

  • Are fire doors to appropriate fire resisting standards?

  • Do all fire doors close fully and form a close fit in the opening?

  • Are fire doors fitted with intumescent strips and smoke seals?

  • Are fire doors in good condition?

  • Is the practice of wedging or otherwise holding doors open avoided?

19 Escape Lighting

  • Is emergency lighting designed, installed and tested in accordance with the current regulations/ standards

  • Is there a reasonable standard of escape lighting provided (this could be natural lighting)?

  • If luminous discharge lighting is fitted is installed in accordance with the current standards?

20 Fire Safety Signs & Notices

  • Are Fire Action Notices in position at all Fire Call Points?

  • Are floor/area layout plans illustrating your location & the fire escape routes posted at all Fire Call Points (construction sites only)?

  • Are Fire Directional signs suitable and sufficient, visible at eye level or as required sprayed on the floor?

  • Is the Fire/Emergency Assembly Point Sign posted in a place of safety, in a prominent position and explained/communicated at the site induction?

21 Means of giving Warning in the event of Fire (Fire Alarm).

  • If a manually operated fire alarm system is required is it provided and suitable?

  • If there is an alarm system is there remote transmission of alarm signals if required?

  • If an automatic fire detection system is required is it provided and suitable?

  • Timber Frame Structures - Are security patrols of the buildings/site undertaken at least hourly outside normal working hours (Insurers agreed 24 hour manned surveillance cameras)?

22 Manual Fire Extinguishing Appliances (Fire Fighting Equipment ).

  • Is there suitable and sufficient provision of Portable Fire Extinguishers?

  • Are the Fire Extinguishers of the correct type/suitable for the works being undertaken in the vicinity?

  • If Hose Reels are required are they provided?

  • Is there a requirement for a Dry Riser or a Wet Riser?

23 Relevant Automatic Fire Extinguishing Systems

  • Type of system:

  • Comments and observations:

24 Facilities, Equipment, Devices & Information for the protection of Fire-Fighters (Grab Pack).

  • Access/Egress for Emergency Services, Width Restrictions, Weight/Loading Restrictions, Turning Circle

  • Location of Gas Shut Off Valves?

  • Location of Electrical Isolation Switches?

  • Location of COSHH Stores/Substances?

  • Location of Fuel Storage Areas?

  • Location of Gas Cylinder Storage Area?

  • Location of Dry/Wet Risers?

  • Location of any possible Holes In Floors?

  • Emergency contact details (both during work hours and out of hours)?

  • Comments and observations:

Part 4: MANAGEMENT OF FIRE SAFETY

25 Procedures & Arrangements

  • Are appropriate Fire Procedures in place? (including arrangements for calling the fire service)?

  • Is there a written Fire Emergency Plan in place (included in the S001) and has this been completed and reviewed where necessary?

  • Is the Fire Emergency Plan readily available for staff to read? Is the Fire Emergency Plan & Grab Pack available to the enforcing authority?

  • Has there been intial contact made with the Fire & Rescue Service informing them of the project requirements and liaison as required?

26 Training

  • Are staff given Fire Safety Instruction during and as part of the CPUK Group site induction?

  • Do staff receive periodic refresher training at suitable intervals (such as toolbox talks)?

  • Are staff with special responsibilities given appropriate training?

27 Testing & Maintenance

  • Is the workplace adequately maintained?

  • Is there weekly testing and periodic servicing of the fire detection and alarm system?

  • Is there monthly, six-monthly and annual testing of the emergency lighting?

  • Is there annual maintenance and testing of fire extinguishing equipment?

  • Is there annual inspection and testing of the lightning protection system?

  • Is there six monthly and annual testing of wet/dry risers?

  • Is there weekly testing and periodic inspection of sprinkler installations?

  • Is there routine checks of fire doors and final exit doors?

  • Other relevant inspection and testing

28 Records/Drills

  • Are there records of Fire Drills having been undertaken? (Head Office = Annually. Construction Sites Traditional Build = 6 Monthly. Timber Frame 3 Monthly.

  • Insert the dates of previous Fire Drills Here.

  • Are there records of fire alarm tests (weekly)?

  • Are there records of emergency lighting tests?

  • Are there records of maintenance and testing of other fire protection systems?

Part 5: RESIDUAL RISK RATING (R.R.R.) (Likelihood x Severity & RECOMMENDATIONS ).

Residual Risk Rating (R.R.R.) (Likelihood x Severity).

  • Likelihood of Risk

  • Severity of Risk

  • Residual Risk Rating (R.R.R.) (Likelihood x Severity)

  • Recommendations

  • Received by responsible person.

  • Competent Person Signature.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.