Title Page
-
Warehouse
-
Date of Inspection
-
Rack Inspector
-
Location
Racking Inspection Checklist
-
All racking within the factory is undamaged and free from dents, chips and damage. (If no, capture below)
-
All racking has the correct loading signs clearly visible at the end of each aisle?
-
All pallet racking has pins inserted throughout to help support it?
-
All racking is adequately secured to the floor
-
All warehouse staff are competent in the stacking of the shelves and understand the loads etc. to use
-
All walkways are kept clear so racking can be safely accessed
-
Checked and key members have no concerns about the racking at the moment
-
Specify the location of the damaged rack by tapping ADD AREA.
DAMAGE
-
Aisle
-
Bay Number
-
What component of the racking system is damaged?
- Frame
- Beam
- Accessory
-
Which part/s of the frame is/are damaged?
- Front uprights
- Front base plate
- Front shims
- Rear uprights
- Rear base plate
- Rear shims
- Bracing
-
Take photos of the damage and identify risk level
- Green (minor damage)
- Amber risk (significant damage)
- Red risk (critical damage)
-
Which part/s of the beam is/are damaged?
- Front beam
- Front clips
- Rear beam
- Rear clips
-
Take photos of the damage and identify risk level
- Green (minor damage)
- Amber risk (significant damage)
- Red risk (critical damage)
-
Which part/s of the accessory is/are damaged?
- Shrink Wrap
- Upright Guards
- Row Spacer
- SWL Signage
-
Take photos of the damage and identify risk level
- Green (minor damage)
- Amber risk (significant damage)
- Red risk (critical damage)
Completion
-
Additional Recommendation
-
All stocks located in the racking systems are checked for any damage.
-
Full Name and Signature of Rack Inspector