Information

  • Report number

  • Client / Site

  • Conducted on

  • Inspection conducted by

  • Location
  • Site contact

Disclaimer

Disclaimer

  • The assessors believe the information contained within this risk assessment report to be correct at the time of printing. The assessors do not accept responsibility for any consequences arising from the use of the information herein. The report is based on matters which were observed or came to the attention of the assessors during the day of the assessment and should not be relied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.

    • This inspection was conducted whilst the racks were 'Fully Loaded'. Due to the product loading there is no guarantee that all faults have been identified.
    • It is the Clients responsibility to ensure that the recommendations within this report are actioned.

    A person conducting a business or undertaking who alters or modifies a rack design without consulting the original or subsequent designer will assume the duties of a designer. Any changes to the design of a structure may affect the health and safety of those who work on or use the structure and must be considered by the person altering or modifying a design.


    Information on the latest works compensation and OHS / WHS laws can be found at the relevant state WorkCover / WorkSafe Authority.

Confidentiality Statement

  • In order to maintain the integrity and credibility of the risk assessment processes and to protect the parties involved, it is understood that the assessors will not divulge to unauthorised persons any information obtained during this risk assessment unless legally obligated to do so.

Routine inspection

  • It is recommended that the end user refer to Section 8 - “Operation and Maintenance of Adjustable Pallet Racking” of AS4084 (Steel Storage Racking) for racking inspection and
    maintenance procedures. As a supplement to the code recommendation, the following information has been compiled based on AS4084 and the FEM recommendation. For your information, FEM (Federation Europeene de la Manutention) is a European industrial body made up from various national organisations representing the storage equipment manufactures in their own country.

    The Pallet Racking system requires no maintenance, other than to replace possible damage through incorrect operation. The system should be regularly inspected.

RACK SAFETY OFFICER / REPORTING PROCEDURE

  • It is recommended that a ‘Rack Safety Officer’ is appointed and a procedure put in place so that any damage or unsafe occurrence can be reported, thus ensuring that any necessary actions can be taken to maintain a safe working environment.
    The safety officer would undertake routine inspections, keeping maintenance and safety reports.

COLOUR CODING FOR RISK IDENTIFICATION

  • The following colour coding; Green, Orange, and Red are classifications of risk as defined by FEM ‘Guidelines for the Safe Use of Static Racking’

    Green Risk: Damage requiring surveillance.
    Orange Risk: Hazardous damage requiring action as soon as possible.
    Red Risk: Very serious damage requiring immediate action.

COLOUR CODE DEFINITIONS

  • GREEN RISK:
    Damage requiring surveillance.
    For damage to frames in which the limits are not exceeded. This would indicate racks where some damage was present but was considered non-critical.
    Such damaged components should be recorded as suitable for further service until the next management inspection, but clearly identified for further re-examination at future inspections.

    ORANGE RISK:
    Hazardous damage requiring action as soon as possible.
    For damage to frames in which the limits are exceeded by up to a factor of two. This would identify an area where the damage was sufficiently severe to warrant remedial work but not so severe as to warrant the immediate off-loading of the rack. Once the rack is unloaded however, it should not be re-loaded until repairs have been carried out. In the event that the storage position remains full for several days after the initial identification of the problem, the rack should be off-loaded for repair without further delay.
    The USER company must have a method of isolating such racks to ensure that they do not come back into use until the necessary repairs have been carried out and the equipment certified as safe. For example, use could be made of dated adhesive labels, which indicate racks that are not to be re-loaded until rectified. In practice any racking with ORANGE RISK category damage should be re-designated RED RISK damage if remedial work has not been carried out within four weeks of the original designation.

    RED RISK:
    Very serious damage requiring immediate action.
    For damage to frames in which the limits exceed a factor greater than two.
    These are situations where a critical level of damage is identified which warrants an area of racking being immediately off-loaded and isolated from future use until repair work is carried out. Such repair work would involve replacement of the damaged item.
    USER companies must have a method of isolating areas to ensure that they do not come back into use prior to the repair work being carried out. For example, a particular bay could be off-loaded in the presence of the inspector and roped off to prevent further use.

INSPECTION INTERVALS

  • Daily Inspections
    This applies to operator care of the system.
    _ Ensure the correct application and use of equipment.
    _ Ensure that the safe working loads are adhered to.
    _ Damaged pallets must not be entered into the system and should be removed as they occur.
    _ Any safety issues or damage to the structure should be reported to the Safety Officer who will carry out the risk assessment and identify the risk as necessary.
    Weekly Inspections
    The Safety Officer will perform visual inspection carried out from ground level of all the racking.
    This should include all forms of accidental damage classed as Red or Orange Risk.
    Monthly Inspections
    This should be carried out in a similar manner to the weekly inspection, but include the physical emptying of random bays in order to carry out a more detailed inspection.
    _ It should also be used to check that items already identified as Red Risk have been isolated with the necessary actions taken to rectify the risk. Similarly Orange Risk items should be checked to ensure repairs are underway.
    _ Ensure that all safe working load signs, maintenance and other safety signs are in place.
    Six to Twelve Monthly Inspections
    Must be completed at least once every Twelve months. A major inspection by a technically competent person fully experienced in the identification and categorisation of rack damage. Such a person may be an external specialist capable of giving an independent assessment of the racking. This review should also examine the performance of the reporting procedures and that actual repairs are being carried out.
    The inspection should be comprehensive and include checking for out-of-plumb and ensure that the rack installation has not been altered. A copy of the load application and configuration drawings shall be retained for this purpose.

Site 1

Site 1

  • Rack inspection check list

  • Serial
  • Rack

  • Bay

  • Observation

  • Comments

  • Item

  • Specifications

  • Specifications

  • Component notes

  • Component notes

  • Specifications

  • Specifications

  • Location

  • Comments

  • Rating

  • Material/Manufacturer

  • Comments

  • Recommended Actions

  • Comments

  • Photo

  • Rectifications Completed by

  • Signature

  • Date

Additional Comments/Reccomendations

  • Additional Comments

  • Photo

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.