Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Signature
Pre Load Inspection
-
Railcar ID
-
Product
-
LD Limit
-
LT Limit
-
CAPY (Gal)
-
Tank Qualification Due
-
Pressure Relief Due
Seals
-
Manway Lid
-
Protective Housing Cover
-
Valve Handle
Initial Check
-
Is the STOP caution (Blue Flag) Installed, Wheels chocked, handbrake set?
-
Tank shell free of rust, graffiti, other visual defects?
-
Safety appliances free of visible defects?
-
Couplers free of visible defects? Double shelf coupler required for hazmat materials.
-
Are placards in place and holder free of visible defects?
-
Placard #
-
Reporting marks visible and legible?
-
Is manhole gasket in good condition?
-
Is pressure relief valve in good condition?
-
Is bottom outlet cap and gasket in good condition?
-
Is there a containment in place and grounding lead connected?
Post Loading
-
Are manway lid bolts in place and undamaged and torqued to specifications? Torque specs: 70,140,200,200
-
Are top valves closed, plugged and secured?
-
Is protective housing closed and secured?
-
Is bottom outlet valve secured and pinned?
-
Total Barrels
-
Outage Gauge