Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Signature

Pre Load Inspection

  • Railcar ID

  • Product

  • LD Limit

  • LT Limit

  • CAPY (Gal)

  • Tank Qualification Due

  • Pressure Relief Due

Seals

  • Manway Lid

  • Protective Housing Cover

  • Valve Handle

Initial Check

  • Is the STOP caution (Blue Flag) Installed, Wheels chocked, handbrake set?

  • Tank shell free of rust, graffiti, other visual defects?

  • Safety appliances free of visible defects?

  • Couplers free of visible defects? Double shelf coupler required for hazmat materials.

  • Are placards in place and holder free of visible defects?

  • Placard #

  • Reporting marks visible and legible?

  • Is manhole gasket in good condition?

  • Is pressure relief valve in good condition?

  • Is bottom outlet cap and gasket in good condition?

  • Is there a containment in place and grounding lead connected?

Post Loading

  • Are manway lid bolts in place and undamaged and torqued to specifications? Torque specs: 70,140,200,200

  • Are top valves closed, plugged and secured?

  • Is protective housing closed and secured?

  • Is bottom outlet valve secured and pinned?

  • Total Barrels

  • Outage Gauge

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.