Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Rain screen handover

  • Date of inspection

  • Block ?

  • Level ?

  • Elevation ?

  • Grid line ?

  • Has all fire barriers been installed in correct position.

  • Has all insulation been installed correctly and fixed.

  • Has all brackets been installed correctly.

  • Are all panels installed correctly

  • Are panels free from scratches

  • Are all flashings complete / i.e.g. Fins / ventilation / drip bars.

  • Has mastic been completed.

  • Has all copings been installed with correct brackets

  • Are all panels the correct colour

  • Has the correct fixing been used.

  • Comments from Barretts management

  • Add media

  • Signed by M-price management/supervisor

  • Signed by Barretts management

  • Please return within 7days from the date above.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.