Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Rain screen handover
-
Date of inspection
-
Block ?
-
Level ?
-
Elevation ?
-
Grid line ?
-
Has all fire barriers been installed in correct position.
-
Has all insulation been installed correctly and fixed.
-
Has all brackets been installed correctly.
-
Are all panels installed correctly
-
Are panels free from scratches
-
Are all flashings complete / i.e.g. Fins / ventilation / drip bars.
-
Has mastic been completed.
-
Has all copings been installed with correct brackets
-
Are all panels the correct colour
-
Has the correct fixing been used.
-
Comments from Barretts management
-
Add media
-
Signed by M-price management/supervisor
-
Signed by Barretts management
-
Please return within 7days from the date above.