Information
-
Site Code
-
Serco
- RCG
- CIP
- Downers
- Ventia
- Connect 8
- Other/ Electrical Companies
-
Prepared by
-
Phone number:
-
Other personnel on site
-
Date
-
Location
Section 1.0 - Site planning and Information
-
This information needs to be completed before accessing the site and shared with the Service Company and RCG.
As a prerequisite please ensure you have read and understood SERCO and RCG H&S Policies
Site Management and Planning
-
Scope of Works (What is planned for today?)
-
undefined
-
***IMPORTANT***
Please acknowledge you read and understood The RCG Health and Safety Policy -
I have read and understood The RCG Health and Safety Policy
-
***IMPORTANT***
Please acknowledge you read and understood The RCG Lone Worker Standards -
I have read and understood The RCG Lone Worker Standard
-
***IMPORTANT***
Please acknowledge you read and understood The RCG Off-Road Driving Standards -
I have read and understood The RCG Off-Road Driving Standard
-
Please click on the link for the latest weather forecast.
-
I confirm that we have read and understand the requirement and confirm , all drivers have the appropriate qualification/certificate
-
I have taken weather conditions into account during my risk assessment.
-
I will consider SAFE EGRESS, once on-site if conditions change!
Site Information
-
Have you received site access information?
-
Please stop work until you have read and understood site access information, hazards and have implemented relevant mitigations and controls!
-
Does the Land Owner(LO) have specific H&S induction process or special requirements for safe access to site?
-
Has required process or induction been completed?
-
Please provide details of induction or process.
-
Stop work until LO requirements is fulfilled.
-
If any additional Site hazards are identified on site I commit to updating NexysOne(4x4 access only, special key instructions, not suitable for MEWP or Crane, etc.).
-
Please describe any additional hazards
-
Do you have Site safety signage?
-
All contractors (including sub-contractors) have been provided with information relating to health and safety for the work they are undertaking?
Safety Gear
-
Personal Protective Equipment/Safety Gear appropriate to the task will be worn?
-
PPE inspected before use?
Competency
-
Are all persons going to the site competent and trained to undertake the tasks on-site?
-
Work should cease until persons competent to undertake the required tasks are on site. An incident report should also be sent to the relevant Principal Contractor
-
Do workers have a copy of their current certificates on-site?
Emergency planning and equipment
-
Is the site able to call for emergency assistance - Fire, Police Ambulance?
-
Stop work and refer back to lone worker standard. Please consider alternative communications.
-
Are appropriate Fire Extinguishers and First Aid kits on site?
-
Do not proceed until you have appropriate equipment with you.
-
I'm prepared for emergencies(Spill Kit, Rescue kit, etc)
-
Do not proceed until you have appropriate equipment with you.
Section 2.0 Agreement
Agreement
-
Assessor signature:
-
Name:
Additional People:
-
Add signature