1st Floor Paint Shop

  • 1. Office/Main Lobby

  • Add media

  • Office area

  • Add media

  • No Alarms Present

  • Add media

  • 2. BC # 1 & 2 Mini System

  • Add media

  • No leaks in pans

  • Add media

  • Proper grounding and bonding

  • Add media

  • 3. Paint Mix Mechanical Room

  • Add media

  • Hydraulic Oil Level (gauge red line)

  • Add media

  • Hydraulic Control Panel (red light present if problem exist)

  • Add media

  • 4. Paint Mix Water Based Paints

  • Add media

  • Tank

  • Add media

  • No pipe leaks

  • Add media

  • No leaks in pans

  • Add media

  • Air exhaust operations on and working

  • Add media

  • 5. Paint Mix Solvent Based Paints

  • Add media

  • Tank

  • Add media

  • No pipe leaks

  • Add media

  • Air exhaust operation

  • Add media

  • 6. Sun Roof Sealer Pump

  • Add media

  • No leak (Check solvent/paint mixer)

  • Add media

  • 7. T/UP Booth

  • Add media

  • No solvent smell present

  • Add media

  • No open solvents in booth

  • Add media

  • 8. Clear Mini System

  • Add media

  • No leaks

  • Add media

  • Properly grounded and bonded

  • Add media

  • 9. Waste Solvent Tank

  • Add media

  • No leaks in pans

  • Add media

  • 10. Primer Mini System

  • Add media

  • No leaks in pans

  • Add media

  • 11. Sealer Pump Room

  • Add media

  • Sealer & deadener leaks (insure outside door is closed)

  • Add media

  • 12. Hot Water Rinse

  • Add media

  • No leaks (check generator)

  • Add media

  • 13. Degreasing

  • Add media

  • No leaks

  • Add media

  • 14. Rinse

  • Add media

  • No leaks

  • Add media

  • 15. Surface Conditioning

  • Add media

  • No Leaks

  • Add media

  • 16. Phosphate Pumps

  • Add media

  • No Leaks

  • Add media

  • 17. UF Module

  • Add media

  • Must have flow, floating

  • Add media

  • No leak, No grey show in fluid, fluid must be clear

  • Add media

  • 18. Mechanical Seal

  • Add media

  • Must have flow, middle valve open

  • Add media

  • No ED (grey) shown in fluid

  • Add media

  • 19. ED Pump, 2-Sided, check maintenance room immediately following:

  • No Abnormal Noises

  • Add media

  • No Leaks

  • Add media

  • All 3 pumps in operation, Check Gauges

  • Add media

  • 20. WWT:

  • Add media

  • No Overflow Trace & Leak

  • Add media

2nd Floor Paint Shop

  • 21. ED Main Bath

  • Add media

  • Is the level between 6-12 inches

  • Add media

  • Must have flow

  • Add media

  • 22. UBS pipe lines, (check panel & heat exchanger)

  • Add media

  • No leaks (check the whole perimeter)

  • Add media

  • 23. Deadener T/UP

  • Add media

  • Shoe covers

  • Add media

  • Gun hose no leaks

  • Add media

  • 24. Deadener Oven

  • Add media

  • No gas alarms

  • Add media

  • No gas smell

  • Add media

  • 25. ED oven, (check panel)

  • Add media

  • No gas alarms

  • Add media

  • No gas smell

  • Add media

  • 26. Primer Oven, (check panel)

  • Add media

  • No gas alarms

  • Add media

  • No gas smell

  • Add media

  • 27. Top Coat #1 (check panel)

  • Add media

  • No gas alarms

  • Add media

  • No gas smell

  • Add media

  • 28. Top Coat #2 (check panel)

  • Add media

  • No gas smell

  • Add media

  • No gas alarm

  • Add media

  • 29. Top Coat #1, 2-sided

  • Add media

  • No gas smell

  • Add media

  • No gas alarm

  • Add media

  • 30. Top Coat Booth # 2, 2-sided

  • Add media

  • No leaks inside

  • Add media

  • No leaks inside

  • Add media

  • 31. Primer Booth

  • Add media

  • No leaks outside booth

  • Add media

  • No leaks inside booth

  • Add media

3rd Floor Paint Shop

  • 32. Top Coat Base Recycle ASH #1 & 2

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

  • 33. HVAC ASH

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

  • 34. Working ASH #1 & 3

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

  • 35. Primer Recycle ASH #1 & 2

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

  • 36. Primer Fresh ASH

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

  • 37. Top Coat Clear Fresh ASH #1 & 2

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

  • 38. Working ASH #2

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

  • 39. Paint Mix ASH

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

  • 40. Top Coat Clear Recycle ASH #1 & 2

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

  • 41. Top Coat Base Fresh #1 & 2

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

  • 42. Working ASH #4

  • Add media

  • No water leaks

  • Add media

  • No gas leaks

  • Add media

1st Floor #43

  • 43. Office Main Lobby

  • Add media

  • No Alarms present

  • Add media

  • Office Area Condition

  • Add media

Comments or Concerns

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.