Title Page

  • Contract number - Name

  • Contact Telephone Number

  • Contact Email

  • Conducted on

  • Surveyed By

PROPERTY DETAILS

  • Site Address - Please add google maps as a satellite image to show property
  • Building Type

  • Details

  • No. of storeys

  • Image of compass in front door

  • Picture of front of property

  • SOLAR PV SURVEY
  • Image of Property (Showing proposed roof/s for the Solar PV panel installation)

  • Image of other roof/s with potential for Solar PV Panel Installation

  • Roof Covering

  • Please specify - Concrete/Clay/Slate

  • Image of Tile

  • Roof Condition External

  • Images of existing roof

  • Orientation of proposed arrays

  • Shading - please note any shading issues.

  • Provide pictures facing away from proposed array to show any shading issues

  • Gutter/Eaves Height from Floor (m)

  • Roof Height (m) - gutter to ridge

  • Roof Width (m)

  • Slope Length (m)

  • Overall building length from front

  • Overall building width from side

  • Scaffold required for each job

  • How many elevations need scaffolding

  • Images required of ground floor area for scaffold - obstructions to be shown

  • Images of access to area being scaffolded

  • Are there any signs of deflection to the existing roof slopes?

  • are there any signs of anything which would cause for concern when fitting panels to the roof?

  • Any site access issue

  • Is there a Loft Hatch?

  • Image of loft hatch

  • Loft hatch sizes

  • Loft Ladders Installed?

  • Floor Boards in Loft?

  • Are boards required for loft walk way, if yes how many meters ?

  • Roof incline/pitch

  • STRUCTURAL INFORMATION
  • Roof Structure External

  • Please specify

  • Depth of Rafter (mm)

  • Width of Rafter (mm)

  • Width Between Rafters (mm)

  • If a flat roof – parapet height needed.

  • Is the roof felted (if not felted, roof waiver form will be prepared)

  • Any signs of birds or any other animals nesting

  • Are there any dwarf walls/props which support the purlins

  • Is there any signs of structural work which has been carried out to the roof structure before?

  • Are there any sign of rot/damage to the internal roof structure?

  • Internal roof structure
  • Images of Internal Roof Structure/Loft space (to assist with roof loadings application)

ROOF CONSTRUCTION

  • Roof type

  • Diagram

    MicrosoftTeams-image (1).png
  • Rafter width

  • Rafter depth

  • Rafter length

  • Web width

  • Web depth

  • Web length

  • bottom chord width

  • bottom chord depth

  • bottom chord length

  • Truss Spacing

  • Diagram

    MicrosoftTeams-image (1).png
  • Purlin width

  • Purlin depth

  • Purlin length

  • rafter width

  • rafter depth

  • rafter length

  • Diagram

    MicrosoftTeams-image (1).png
  • roof joist width

  • roof joist depth

  • roof joist length

  • roof joist span

  • span between intermediate supports

  • Battery and Inverter to be located in the same location - 300mm ventilation on each side needed

  • Proposed Inverter & Battery location

  • Image of Inverter & Battery Location

EXISTING Electrics/Proposed Cable run

  • Does the customer have a smart meter present

  • Existing location of the meter (if outside meter box, take a photo standing back with the meter box open).

  • Image of current meter reading

  • Image of cut-out - clear image required for DNO

  • Maximum demand AMPs per phase (can be found at cut-out)

  • Is the property 1-phase

  • Note - if this is 3-phase, please indicate on what phase the Solar PV is to connected to

  • Existing location of fuse box in house - required for electricians

  • Insert Image of Distribution Board - clear image required for DNO

  • Fuseboard - are there any spare ways - confirm amount. If not, new sub-board will be required

  • Are there any additional electrical items at the property - EV chargers, Heat Pumps etc (required for DNO application) Please add images and data for all additional electrical items at property.

  • If EV charger need following. Date of installation (approx), Manufacturer, Manufacturer Ref No. Model name.

Surveyor Notes/Customer Details

  • Approx age of property.

  • Number of bedrooms

  • Is the property in area of concern that may stop the works due to its location. If yes, customer to apply and provide approved plans/consent

  • Dose the customer have WIFI

  • Video required of external and internal areas of the house - cable run requirements

  • Video taken (add video to media)

  • Roof plan required for each proposed roof also property plan for scaffold issues (add plans to media)

  • Roof & Property plans provided

  • Surveyor handover notes

DECLARATION

  • I can confirm that this survey has been carried out in a detailed and accurate manner.
    All information in this report is accurate and true.

  • Surveyors Declaration

  • Customer signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.