Title Page
-
Site conducted
-
City Ref
-
Conducted on
-
Prepared by
Untitled Page
-
Name of Contractor who carried out the Build
-
Is it known which team did the work
-
Engineer Names
-
What needs to be reworked
-
Photo Required
-
Will this require the contractor to Revisit
-
Are you able to rectify while onsite
-
Photo required to show rectified