Information
-
Document No.
-
Production WTS Section 44 Daily Pit Inspections - Mine 2
-
Load, haul and other areas.
-
Western Turner Syncline Section 10
-
Date and time of inspection
-
Shift
-
Rain event
-
Team
- Team 1
- Team 2
- Team 3
- Team 4
-
Inspection completed by
- Peter Blackaby
- Cameron Perry
- Ben Olman
- Thomas Quinn
- Alan Gillet
- Team 3B Supervisor
- Dave Hildreth
- Brian Stobaus
- Step-up Supervisor
-
Step-up Supervisor:
Inspections: Load & Haul
-
Active areas: North Ridge Pit
-
02 Dust suppression: Is dust suppression adequate?
-
04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?
-
07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?
-
12 Lighting for night-shift: Sufficient lighting in place for night-shift?
-
15 Vertical faces: Clean of loose material, catch bund in place if required?
-
16 Catch bunds: In place below high wall on all haul roads and access ways?
-
18 Open edges: Windrow/Barricade present?
-
19 Environmental: All ground disturbance approved? Any fuel/oil spills to report?
-
20 Signage: Clean of any mud? Correctly located? Visible?
-
24 No-go areas: Cones/Windrows in place?
-
25 Bench condition: Bench is to correct RL? Clear of spillage, obstructions clearly demarcated i.e. lighting plants, stemming?
-
Active areas: South Ridge Pit
-
02 Dust suppression: Is dust suppression adequate?
-
04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?
-
07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?
-
12 Lighting for night-shift: Sufficient lighting in place for night-shift?
-
15 Vertical faces: Clean of loose material, catch bund in place if required?
-
16 Catch bunds: In place below high wall on all haul roads and access ways?
-
18 Open edges: Windrow/Barricade present?
-
19 Environmental: All ground disturbance approved? Any fuel/oil spills to report?
-
20 Signage: Clean of any mud? Correctly located? Visible?
-
24 No-go areas: Cones/Windrows in place?
-
25 Bench condition: Bench is to correct RL? Clear of spillage, obstructions clearly demarcated i.e. lighting plants, stemming?
-
Active areas: Tail Pit
-
02 Dust suppression: Is dust suppression adequate?
-
04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?
-
07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?
-
12 Lighting for night-shift: Sufficient lighting in place for night-shift?
-
15 Vertical faces: Clean of loose material, catch bund in place if required?
-
16 Catch bunds: In place below high wall on all haul roads and access ways?
-
18 Open edges: Windrow/Barricade present?
-
19 Environmental: All ground disturbance approved? Any fuel/oil spills to report?
-
20 Signage: Clean of any mud? Correctly located? Visible?
-
24 No-go areas: Cones/Windrows in place?
-
25 Bench condition: Bench is to correct RL? Clear of spillage, obstructions clearly demarcated i.e. lighting plants, stemming?
-
Active areas: Other pit
-
Pit:
-
02 Dust suppression: Is dust suppression adequate?
-
04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?
-
07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?
-
12 Lighting for night-shift: Sufficient lighting in place for night-shift?
-
15 Vertical faces: Clean of loose material, catch bund in place if required?
-
16 Catch bunds: In place below high wall on all haul roads and access ways?
-
18 Open edges: Windrow/Barricade present?
-
19 Environmental: All ground disturbance approved? Any fuel/oil spills to report?
-
20 Signage: Clean of any mud? Correctly located? Visible?
-
24 No-go areas: Cones/Windrows in place?
-
25 Bench condition: Bench is to correct RL? Clear of spillage, obstructions clearly demarcated i.e. lighting plants, stemming?
-
Active areas: Head Pit
-
02 Dust suppression: Is dust suppression adequate?
-
04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?
-
07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?
-
12 Lighting for night-shift: Sufficient lighting in place for night-shift?
-
15 Vertical faces: Clean of loose material, catch bund in place if required?
-
16 Catch bunds: In place below high wall on all haul roads and access ways?
-
18 Open edges: Windrow/Barricade present?
-
19 Environmental: All ground disturbance approved? Any fuel/oil spills to report?
-
20 Signage: Clean of any mud? Correctly located? Visible?
-
24 No-go areas: Cones/Windrows in place?
-
25 Bench condition: Bench is to correct RL? Clear of spillage, obstructions clearly demarcated i.e. lighting plants, stemming?
-
Active areas: Other pit
-
Pit:
-
02 Dust suppression: Is dust suppression adequate?
-
04 Access road conditions: Are access roads and ramps in good condition? Delineated? Correct width? Is the gradient correct? Toe and crest of ramp to design? Camber correct? Ramp camber towards the wall?
-
07 Windrows and bunding: Windrows adequate? Roads, ramps, floors, 1.8m? 700m? Axle height of largest tyred vehicle? Sufficiently wide enough to stop equipment?
-
12 Lighting for night-shift: Sufficient lighting in place for night-shift?
-
15 Vertical faces: Clean of loose material, catch bund in place if required?
-
16 Catch bunds: In place below high wall on all haul roads and access ways?
-
18 Open edges: Windrow/Barricade present?
-
19 Environmental: All ground disturbance approved? Any fuel/oil spills to report?
-
20 Signage: Clean of any mud? Correctly located? Visible?
-
24 No-go areas: Cones/Windrows in place?
-
25 Bench condition: Bench is to correct RL? Clear of spillage, obstructions clearly demarcated i.e. lighting plants, stemming?
Inspections: Other areas
-
Active area: Workshop waterstand
-
01 Active working area: Is area being used?
-
08 Dump construction: Dump to design, All ground disturbance approved?
-
13 House keeping: Is the work area housekeeping in order?
-
20 Signage: Clean of any mud? Correctly located? Visible?
-
21 Fencing and safety signage: Adequate and in good condition? Handrails not broken? Signage legible?
-
22 Emergency equipment: Emergency Lighting in service (e.g. eyewash stations and emergency exit lighting)? Fire equipment in place and serviceable (e.g. hose reels and fire extinguishers)? Eyewash station Serviceable?
-
23 Check for build up of grease, oil and mud: Is there any build up on mobile equipment? Is the build up a fire hazard?
-
24 No-go areas: Cones/Windrows in place?
-
Active area: Office crib areas
-
01 Active working area: Is area being used?
-
08 Dump construction: Dump to design, All ground disturbance approved?
-
13 House keeping: Is the work area housekeeping in order?
-
20 Signage: Clean of any mud? Correctly located? Visible?
-
21 Fencing and safety signage: Adequate and in good condition? Handrails not broken? Signage legible?
-
22 Emergency equipment: Emergency Lighting in service (e.g. eyewash stations and emergency exit lighting)? Fire equipment in place and serviceable (e.g. hose reels and fire extinguishers)? Eyewash station Serviceable?
-
23 Check for build up of grease, oil and mud: Is there any build up on mobile equipment? Is the build up a fire hazard?
-
24 No-go areas: Cones/Windrows in place?
-
Active area: PC3
-
01 Active working area: Is area being used?
-
08 Dump construction: Dump to design, All ground disturbance approved?
-
13 House keeping: Is the work area housekeeping in order?
-
20 Signage: Clean of any mud? Correctly located? Visible?
-
21 Fencing and safety signage: Adequate and in good condition? Handrails not broken? Signage legible?
-
22 Emergency equipment: Emergency Lighting in service (e.g. eyewash stations and emergency exit lighting)? Fire equipment in place and serviceable (e.g. hose reels and fire extinguishers)? Eyewash station Serviceable?
-
23 Check for build up of grease, oil and mud: Is there any build up on mobile equipment? Is the build up a fire hazard?
-
24 No-go areas: Cones/Windrows in place?
-
Active area: Fuel farm
-
01 Active working area: Is area being used?
-
08 Dump construction: Dump to design, All ground disturbance approved?
-
13 House keeping: Is the work area housekeeping in order?
-
20 Signage: Clean of any mud? Correctly located? Visible?
-
21 Fencing and safety signage: Adequate and in good condition? Handrails not broken? Signage legible?
-
22 Emergency equipment: Emergency Lighting in service (e.g. eyewash stations and emergency exit lighting)? Fire equipment in place and serviceable (e.g. hose reels and fire extinguishers)? Eyewash station Serviceable?
-
23 Check for build up of grease, oil and mud: Is there any build up on mobile equipment? Is the build up a fire hazard?
-
24 No-go areas: Cones/Windrows in place?
Declaration
-
I have performed a safety inspection of the WTS Pit ensuring that the workplaces are safe for persons working there. The pit was found to be:
-
Action taken:
-
I have taken the appropriate actions to ensure that any hazards I identified during my inspection have been rectified and/or have been demarcated in such a way as to not present a hazard to any persons working on the mine site.
-
I am satisfied that the mine is safe for persons to work in.
-
Supervisor inspecting:
- Peter Blackaby
- Cameron Perry
- Ben Olman
- Thomas Quinn
- Alan Gillet
- Team 3B Supervisor
- Dave Hildreth
- Brian Stobaus
- Step-up Supervisor
-
Step-up Supervisor:
-
Add signature
-
Oncoming Supervisor:
- Peter Blackaby
- Cameron Perry
- Ben Olman
- Thomas Quinn
- Alan Gillet
- Team 3B Supervisor
- Dave Hildreth
- Brian Stobaus
- Step-up Supervisor
-
Step-up Supervisor:
-
Add signature
-
Quarry Manager or Delegate:
-
Additional comments: