Title Page
-
Site conducted
-
Project Reference Number
-
Property Location
-
Conducted on
-
Prepared by
-
Brief description of the works (Internal, external, refurbishment, demolition etc.)
-
Brief description of the site (Rural, urban, greenfield, occupied building etc.)
-
Is there adequate natural or artificial light to carry out the task?
-
Is there a likelihood of Asbestos containing materials to be encountered during the works?
-
Is a Asbestos Register available for the property/project?
-
Is there a likelihood of the tasks involved creating excessive dust/airborne contaminants?
-
Is there a likelihood of the tasks involved creating uncontrolled fumes?
-
Do the tasks involved require entry to a confined space?
-
Is there a likelihood of operatives coming into contact with sewage?
-
Are there any concerns regarding access to and from the proposed tasks?
-
Please confirm access concerns
- Interaction with pedestrians
- Interaction with vehicles
- Confined/restricted access
- Uneven terrain/slippery surfaces
- Interaction with building users
- Other (details in notes)
-
Are there any significant risks presented through the use of vehicles for the task?
-
Are there any significant risks presented through the interaction with vehicles for the task?
-
Is the use of heavy plant required for the tasks?
-
What types of heavy plant are required?
- Mini digger (0 - 6 metric tons)
- Midi digger (6 - 10 metric tons)
- Standard digger (10 - 90 metric tons)
- 1 ton dumper
- 3 ton dumper
- 6 ton dumper
- 9 ton dumper
- Fork lift truck
- Mobile crane
- Hi-ab/Lorry Loader
- Tower crane
- Other (details in notes)
-
What equipment/tools are required for the task?
- Hand Tools
- Power tools (Battery)
- Power tools (110v)
- Power tools (240v)
- Rotating cutting equipment (abrasive wheels)
- Vibrating tools e.g. floor scrapers, ragglers.
- Workshop machinery
- Other (details in notes)
-
Are Hot Works required for the task
-
Will a Hot Works permit system be implemented?
-
Is the task in close vicinity of a watercourse or body of water that presents significant risk?
-
Is there a requirement to work at height to complete the task?
-
What work at height equipment will be used to complete the task?
- Step ladders
- Ladders
- Fixed scaffold
- Tower scaffold
- Mobile Elevated Working Platforms (MEWP)
- Hop-up/Work platform
- Other (details in notes)
-
Are works to electrical circuits included in or required for the task?
- Yes
- No
- Unable to determine at time of audit
-
Does the circuit have to remain live during the works?
- Yes
- No
- Unable to determine at time of audit
-
Does the task involve or require works to High Voltage cables?
- Yes
- No
- Unable to determine at time of audit
-
Are works to mechanical systems included or required for the task?
- Yes
- No
- Unable to determine at time of audit
-
Is there a significant risk of Legionnaires posed by the works or as a result of the task being carried out?
- Yes
- No
- Unable to determine at time of audit
-
Is any of the mechanical system to be worked with under excessive pressure?
- Yes
- No
- Unable to determine at time of audit
-
Is any of the mechanical system subject to excessive heat?
- Yes
- No
- Unable to determine at time of audit
-
Does the task include excavation work?
- Yes
- No
- Unable to determine at time of audit
-
Has the equipment required been stated above?
-
Confirm equipment required in heavy plant section
-
Will the excavation be deeper than 800mm from Ground level?
- Yes
- No
- Unable to determine at time of audit
-
Shuttering or battering back may be required. Confirm approach or seek further advice.
-
Does the task include or require the use of any equipment included under COSHH provision (Substances Hazardous to Health).
- Yes
- No
- Unable to determine at time of audit
Method of works
-
Please note any site specific methodology that is required to complete the task e.g. access prevents use of large vehicle, nature of works require minimum 2 person team etc.
Hazard Identification Summary Page
-
Please highlight all relevant risks identified
- Excavations
- Overhead cables
- Underground/buried services
- Lifting operations
- Manual Handling
- Use of hand tools
- Use of power tools
- Use of vehicles
- Use of heavy plant
- Work at height
- Work in the vicinity of water
- Traffic
- Interaction with the public
- Interaction with building/service users
- COSHH
- Open flames/Hot works
- Confined space/restricted access
- Asbestos
- Legionella
- Weil's disease
- Vibrations
- Dust
- Fumes
- Noise
- Environmental impact/waste management
- Other (details in notes)
-
Any other comments/observations.
Conclusion
-
Supervisor/Manager
-
Signature
-
Date