Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

00.00 Risk Assessment based on Fine and Kinney.

  • Site / Loading - Unloading area:

  • Overall situation;

  • General Unloading Information:

00.00 Certification

  • Certificates based on Safety:

  • Certificates (other):

01.00.00 RA - Van den Bosch Transporten BV

02.00.00 RA - Van den Bosch Transporten BV

03.00.00 RA - Van den Bosch Transporten BV

04.01.01 Emergency Response.

  • 04.01.01 Loading - Unloading area: <br><br>- Evacuation plan<br>- Fire extinguisher<br>- First aid<br>- Instructions<br>- Escape routes<br>- Communication<br>- Emergency stop, Emergency response plan, Sops, Pictograms<br>- Emergency team included practical training results<br>- Spillage (water / absorption / waste containers)

  • Effect off possible injury?

  • Exposure to the latent danger?

  • Likelihood of the risk?

  • Risk (Result without any action)

  • Recommendation to reduce the risk?<br><br>- Design<br>- Collective action<br>- Individual action<br>- PPE<br>- Caution (manual / picto's / education)

  • Result after recommendet action;

  • Responsible?

  • Action processed before:

  • Status

04.01.02 Design of workplaces.

  • 04.01.02 Loading - Unloading area:<br><br>- Characterisctics work place<br>- Size movement place<br>- Trip and slip hazard / floor<br>- Fall from height hazard<br>- Electrotechnical operations / ground connection<br>- Marking high risk situations<br>- Toilets / changingsrooms<br>- Douche / shower / eye shower<br>- Separate room for eating / drinking / smoking

  • Effect off possible injury?

  • Exposure to the latent danger?

  • Likelihood of the risk?

  • Risk (Result without any action)

  • Recommendation to reduce the risk?<br><br>- Design<br>- Collective action<br>- Individual action<br>- PPE<br>- Caution (manual / picto's / education)

  • Result after recommendet action;

  • Responsible?

  • Action processed before:

  • Status

04.01.03 Hazardous and a toxic substances.

  • 04.01.03 Loading - Unloading area:<br><br>- Carefulness<br>- Information Biological, biohazard, radioactive, infection, virus. (ADR 6-7)<br>- Chemical, gas, toxics, carcinogen. (ADR 2-3-4-5-8-9)<br>- Explosion risk. ADR (1)<br>- Dust<br>- Legionella.

  • Effect off possible injury?

  • Exposure to the latent danger?

  • Likelihood of the risk?

  • Risk (Result without any action)

  • Recommendation to reduce the risk?<br><br>- Design<br>- Collective action<br>- Individual action<br>- PPE<br>- Caution (manual / picto's / education)

  • Result after recommendet action;

  • Responsible?

  • Action processed before:

  • Status

04.01.04 Physical stress.

  • 04.01.04 Loading - Unloading area:<br><br>- Avoiding and restrictions<br>- Information<br>- Regular medical investigation<br>- Drugs / Alcohol<br>- Monitor screen operators<br>

  • Effect off possible injury?

  • Exposure to the latent danger?

  • Likelihood of the risk?

  • Risk (Result without any action)

  • Recommendation to reduce the risk?<br><br>- Design<br>- Collective action<br>- Individual action<br>- PPE<br>- Caution (manual / picto's / education)

  • Result after recommendet action;

  • Responsible?

  • Action processed before:

  • Status

04.01.05 Physical factors.

  • 04.01.05 Loading - Unloading area:<br><br>- Climate <br>- Noise <br>- Lightning

  • Effect off possible injury?

  • Exposure to the latent danger?

  • Likelihood of the risk?

  • Risk (Result without any action)

  • Recommendation to reduce the risk?<br><br>- Design<br>- Collective action<br>- Individual action<br>- PPE<br>- Caution (manual / picto's / education)

  • Result after recommendet action;

  • Responsible?

  • Action processed before:

  • Status

04.01.06 Work equipment.

  • 04.01.06 Loading - Unloading area:<br><br>- Maintenance<br>- CE<br>- Moving parts<br>- Lifting<br>- Welding

  • Effect off possible injury?

  • Exposure to the latent danger?

  • Likelihood of the risk?

  • Risk (Result without any action)

  • Recommendation to reduce the risk?<br><br>- Design<br>- Collective action<br>- Individual action<br>- PPE<br>- Caution (manual / picto's / education)

  • Result after recommendet action;

  • Responsible?

  • Action processed before:

  • Status

04.01.07 PPE.

  • 04.01.07 Loading - Unloading area:<br><br>- Availability<br>- Use<br>- Supervision<br>- Maintenance

  • Safety boots

  • Goggles

  • Helmet

  • Face protection (Full Face Mask with filter, safety glass (closen - open))

  • Ear protection

  • Fall protection / harnas

  • Hyvis

  • Clothes (ATEX) / Chemical suit / Covering

  • Effect off possible injury?

  • Exposure to the latent danger?

  • Likelihood of the risk?

  • Risk (Result without any action)

  • Recommendation to reduce the risk?<br><br>- Design<br>- Collective action<br>- Individual action<br>- PPE<br>- Caution (manual / picto's / education)

  • Result after recommendet action;

  • Responsible?

  • Action processed before:

  • Status

04.01.08 General comment

  • 04.01.08 General comment?<br><br>- Pressure<br>- Sampling<br>- Vapour Tank / Silo<br>- Vapour Return<br>- Vapour Hoses<br>- Product<br>- Nitrogen / CO2<br>- Area<br>- Handrail / Custom cover (douane)<br>- Entry chassis<br>- Spill<br>

04.02.00 Summary

  • 00: Final Result

  • 01: Elimination of the hazard or preventing the risk.<br><br>Examples:<br>a) Repairing or replacing faulty equipment.<br>b) Eliminating dangerous work processes (e.g. by purchasing pre-cut materials or substances in quantities that do not require decanting).

  • 02: Substitution of the hazard with an other that has a lesser risk.<br><br>Examples;<br>a) Use a different, less dangerous piece of equipment.<br>b) Use safer materials or chemicals.

  • 03: Isolation of the hazard that is creating risk to employees and others.<br><br>Examples<br>a) Place noisy equipment into their own soundproof enclosure – e.g. compressors in a workshop.<br>b) The use of fume cupboards is a good way of isolating dangerous chemicals from workers using them.

  • 04: Engeneerings controle. Minimising the risk by engeneering.<br><br>Examples<br>a) Adding machine guards or lock-out devices.<br>b) Changing lighting to reduce glare<br>c) Installing exhaust fans, etc<br><br>

  • 05: Administrative measures (implementing safe workings practices).<br><br>Examples;<br>a) Establish written safe work procedures.<br>b) Change daily routines, e.g. so that keyboard operators get breaks from keyboarding to do other duties.

  • 06: Personal Protective Equipment (least effective way of controllingnhazard).<br><br>Note;<br>a) PPE is only useful when it is in good condition and always worn correctly.<br>b) People need to know when to wear their PPE and how to fit and look after it.<br>c) Employers must ensure that the equipment provided is appropriate for the person and controls the risk for the person.

  • 07: Permit to work requested?

05.00.00 Closing

  • Date inspection?

  • Appointments?

  • Review?

  • Priority?

  • Signature Auditee

  • Signature Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.