Title Page

  • Premises:

  • Location:

  • Activity:

  • Date of commencement:

  • Risk Assessment Nr:

  • Person Preparing Assessment:

  • BYUK Representatives:

  • Client/resident contact details:

  • Date reviewed:

  • Signature

Page 2

  • Scope of Works:

Personnel and responsibilities:

  • Supervisor (First Aider)

  • Operative (First Aid Trained)

  • Operative (First Aid Trained)

  • Other Representatives or Sub-contractors:

Number of persons exposed:

  • Employees:

  • Other workers:

  • Public/Visitors:

  • Young persons:

  • Inexperienced workers:

  • Total number of persons at risk:

Access / Egress:

  • What access / egress is available? (Eg: parking, route of entry etc)

Plant / Equipment:

  • What plant or equipment will be used? (Eg: scissor-lift, ladder etc)

Materials:

  • What materials will be used?

Consents / Work Permits:

  • What consents/permits will need to be granted? (Eg: roof access, ladder etc)

Weather considerations:

  • What is the weather forecast? What hazards may this cause?

Housekeeping:

  • All surplus material and waste will be disposed of by BYUK. All work area to be cleaned and inspected prior to leaving site.

Welfare Facilities:

  • Nearest welfare facilities are:

EMERGENCIES:

  • Minor accidents can be addressed by one of the First Aiders present on site. First Aid provision is located inside BYUK vans.

  • Nearest A&E department / Hospital is:

Sequence of Works (Methodology)

  • 1.

  • undefined

  • 2.

  • undefined

  • 3.

  • undefined

  • 4.

  • undefined

  • 5.

  • undefined

  • 6.

  • undefined

  • 7.

  • undefined

  • 8.

  • undefined

  • 9.

  • undefined

  • 10.

  • Risk Reduction (tap to add)
  • Hazard Identified:

  • Consequences:

  • Likelyhood (L):

  • Severity (S):

  • TOTAL RISK RATING BEFORE (L X S):

  • REQUIRED CONTROL MEASURES:

  • Likelihood After Control Measures (L):

  • Severity After Control Measures (S):

  • TOTAL RISK RATING AFTER CONTROL MEASURES (L X S):

  • See Table Below

    Risk Scores Table JPEG.jpg
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.