Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
JOB DESCRIPTION
Take an Image of the area being assessed.
-
Image
IDENTIFY HAZARDS
-
Overhead lines
-
Electricity
-
High voltage
-
Electrical contact
-
Fault arc
-
Fire / Explosion
-
Hot work
-
Mechanical
-
Noise
-
Lighting
-
Plant / Behicles
-
Roads / Traffic
-
Topography
-
Excavation
-
Trench collapses
-
Confined space
-
Access / Exits
-
Fatigue
-
Slip / Trip
-
Falling / Flying objects
-
Heights / Falls
-
Weather conditions
-
Hot environment
-
Sun exposure
-
Ultra-violet radiation
-
Manual handling
-
Vibration
-
Pinch points
-
Sharp edges
-
Cuts and abrasions
-
Dust
-
Fumes
-
Gases
-
Oxygen levels
-
Vapours
-
Liquids
-
Steam
-
Chemicals / Substances
-
Ceiling space
RISK MATRIX
-
Add media
RISK SCORE
-
High; Moderate; Low
IMPLEMENT CONTROL MEASURES
-
Isolate overhead lines
-
Isolation
-
Mechanical locking device
-
Switchboard rescue kit
-
Safety observer
-
Barricade / Fence
-
Rubber mat / Barrier mat
-
Insulating gloves
-
Safety gloves
-
Helemt
-
Face shield
-
Dust mask
-
Other PPE
-
Fire blanket
-
Extinguishers
-
Mechanical aid
-
Safety equip/devises
-
Decontamination
-
Water
-
Solar protection
-
Ventilation
-
House keeping
-
Lighting
-
Scaffold
-
Mobile work platform
-
Safety harness
-
Signage
-
Signaling
-
Communication equipment
-
Monitor / gas monitor
-
Emergency procedure
-
Work procedure
-
Inductions / briefings
-
Training
-
Work out of hours
WORK METHOD STATEMENT WORKING TO
-
WSM 1. basic fault finding WSM on LV MCC or similar panels
-
WSM 2. Working in a trench or pit at a depth of 1.5 m or more
-
WSM 3. Confined space
-
WSM 4. Working with asbestos
-
WSM 5. Live work
-
WSM 6. Isolation and work on electrical equipment
-
WSM 7. Conduit installation, prior to pouring concrete
-
WSM 8. Conduit installation in the ground
-
WSM 9. Conduit installation in the ground
-
WSM 10. Cable and ladder tray installation
-
WSM 11. Working in risers
-
WSM 12. Using portable ladders
-
WSM 13. Installing light fittings
-
WSM 14. Installation of switch boards
-
WSM 15. Installation of pyrotenax (MIMS) cable
-
WSM 16. Installation of lighting looms
-
WSM 17. Installation of cable supports
-
WSM 18. Installation of mains
-
WSM 19. Installation of switchboard connections
-
WSM 20. New work in existing switchboards
-
WSM 21. Installation of sub mains
-
WSM 22. Installation of power and lighting cables
-
WSM 23. Installation of power points
-
WSM 24. Manual handling
-
WSM 25. Working with elevated work platforms
-
WSM 26. Using mobile scaffolds
-
WSM 27. Isolate, lockout and test
-
WSM 28. Working at heights
-
WSM 29. Installing ceiling mounted lights and speakers
-
WSM 30. Removal of PCB's
-
WSM 31. Testing and tagging of electrical appliances
-
WSM 32. Disconnecting an existing installation
-
WSM 33. Installation of SELV cabling
RECORD PROCEDURES
-
HAZARDS
-
RISK SCORE 1
-
APPLY CONTROL MEASURES WSM
-
RISK SCORE 2
IF RESIDUAL RISK NOT LOW, REDO CONTOL MEASURES
-
If residual risk low, commence work
-
Monitor and review effectiveness
RISK ASSESSMENT CARRIED OUT BY
-
Name
-
Name
-
Name
-
Name
-
Name
-