Information
-
3CIX RA (Cabling & Splicing)
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Risk Assessment
-
Are there any obvious physical hazards that may affect the Operatives on site? E.g.exposed wiring, loose fittings, damaged pathways, decay pole??
-
Are there any unsafe areas the Operatives must access or pass through to complete their work?
-
Are there sufficient arrangements to avoid sharp injuries? Safety Gloves, PPEs.
-
Is team is fully equipped with required PPEs and tools?
-
Is there adequate lighting on site whilst operatives are working?
-
Is there inspected ladder on site ?
-
Is ladder inspection conducted in last three months?
-
Is ladder tied from two point tightly with the pole?
-
Is ladder have non slip feet mat?
-
Is pre climb testing conducted on pole?
-
If using MEWP, is it LOLER Certified?
-
Does MEWP operate have valid IPAF Training Certificate?
COSHH Assessment
-
Is there first aid box, qualified first aider available to deal with emergency?
-
Is there COSHH items waste disposal process for the site operatives? E.g fiber sharps bin
-
Is Working GDU available for gas testing before operating in confined space?
-
Are there enough safety measures in place to perform activity safely Without being exposed to harmful/hazardous substances)
-
Are all chemicals and COSHH items labeled?
-
Are there any environmental issues on site that affect the operatives? Extreme weather, hazardous gases , fumes and dust, noise above acceptable limit?
-
Is there anything hazardous that the Operatives need to work with, near or dispose of? E.g. Laboratory, fuel depot, bulk chemicals, train tracks, Highway?