Title Page
-
Conducted on
-
Reporter's Name & Company Represented:
-
Location
INSPECTION DETAILS
-
Reporter Job Title:
-
Company Inspected:
-
Works Team Name / Reference
-
Contractor Works Manager / Supervisor:
-
Team Leader's Name:
-
no. of Operatives on Site:
-
Works Vehicle's Registration no.
-
LCRA Borough PERMIT no.
-
Job Pack / Section Reference:
NRSWA RESTRICTIONS
-
Has Inspection Lead had to order the suspension of works?
Quality and Safety
1.0 Site Safety
-
Is all required PPE available and being worn for individual tasks?
-
Is a First Aid Kit available, in a satisfactory and replenished condition?
-
Do the team have access to adequate welfare facilities?
-
Is there a copy of the NGE Incident Management Plan?
-
Are gas cylinders secured & stored correctly - IF APPLICABLE?
-
Are all hand tools in good condition and meet the requirements of standard issue?
-
Are all power tools in good condition and being used safely?
-
Are vibrating tools maintained in good working order?
-
Is all Vibrating Equipment assessed and tagged?
-
Are appropriate Cable Locators available, calibrated and in use?
-
Is Gas Detection Equipment on site appropriate, in working order and correctly used, - IF APPLIABLE?
-
Are the correct type of chamber and joint box/cabinet keys available?
2.0 Vehicles
-
Do vehicles have working beacons and approriate chevron markings?
-
Are vehicles tidy and clean?
-
Are vehicles parked safely & securely without causing obstruction?
3.0 Work Pack & Site Documentation
-
Is a legible copy of the work pack/order on site and understood?
-
Are Site Specific Risk assessments in place?
-
Have suitable Utility Plans been issued and available on site?
-
Have works been undertaken as planned?
4.0 Works Practices / H&S
-
Are safe digging practices and HSG47 being adhered to?
-
Are all appropriate buried services identified and traced?
-
Are all identified buried services visibly marked?
-
Are excavations stable and free from excess water?
-
Are stacked and excavated materials away from edge of the excavation?
-
Is work site tidy and free from tripping hazards?
-
Has any damage caused by 3rd parties been photographed and the client informed? IF APPLICABLE.
5.0 NRSWA
-
Has the appropriate opening notice/permit to work been raised and is available to view on site?
-
Are there persons on site with the correct NRSWA certification?
-
Is the Signing & Guarding Layout in accordance with the ACOP?
-
Is the site clearly signed and directions understandable by motorists or pedestrians
-
Are all works taking place within a safely barriered area?
-
Are the correct Works information boards provided and in use?
-
Do information boards display appropriate notification and contact numbers?
-
Are signs, cones, barriers etc, clean and in good condition?
-
Are kerb ramps and pedestrian ramps in use where necessary?
-
CSCS accreditation card available, If Applicable?
9.0 CABINET WORKS
11.0 CABINET NODE WORK
-
Cable in correct duct?
-
Cable management used?
-
Cable degreased?
-
Cable tagged/ labelled correctly?
-
Splice tray fitted & labelled OK?
-
All shelves fitted correctly to plans?
-
Connections correct & terminated?
-
Earthing OK?
-
Doors shut & locked?
-
Krones labelled and terminated correctly?
12.0 Internal Cabling
-
Is Cable Installation Specification adhered to for Internal works?
-
Confined Space Risk assessment required and undertaken?
-
Is the point of entry/gas seal//fire stopping checked and compliant?
-
Is cable routed / clipped OK?
-
Is all cabling / trunking straight secure neat & tidy?
-
Are sockets installed and labelled correctly?
-
Is all cable labelling correct?
-
All NTTP / Splice Points labelled?
-
Is all fibre waste disposed of correctly?
-
IDP's labelled / Lids fitted?
-
Equipment panel locked where required?
-
Test equipment in calibration?
-
Check cable distance?
-
Site records completed?
-
Site neat & tidy?
-
Floor / Ceiling Tiles OK?
CLOSE OUT
-
Signature: