Title Page

  • Site conducted

  • Site Name

  • Address

  • Operators on Site (Please select all operators on site)

  • Operator Ref (If multiple operators on site, please list all site references)

  • Date and Time

  • Company

  • Prepared by

  • Was a MEWP used during this visit?

  • Please can you provide before and after photos to show the condition of the access track is the same as how it was found?

  • If any issues identified on site, which you perceive to require immediate attention i.e. open cabinet door, please ensure these are reported to the Access team on the day of visit so they can be actioned immediately. As site owners Shared Access are responsible for reporting any issues/hazards to the relevant operator.

Site Information

  • Any failed responses (highlighted in red) should be rectified on site where possible and detailed in the report. Any items that can not be rectified during the visit should be reported to the Shared Access Maintenance Team whilst on site. Photos and additional information are required for any failed responses.

Structure Based Equipment

  • How many antennas are installed? (Refer to As Built drawings for shrouded monopoles)

  • How many dishes are installed?

  • Is any other Operator equipment installed on this structure? (e.g. RRU's, MHA's) Please do not reference any equipment at ground level

  • Please list any additional equipment on the structure (including quantity and location) Please do not reference any equipment at ground level.

Ground Based Equipment

  • Is any other Operator equipment installed at ground level? (e.g. additional cabinet) Please do not reference any equipment in cabinets

  • Please list any additional equipment (including quantity and location) Please do not reference any equipment in cabinets.

  • How many Operator cabinets are on site? (excluding the EMC)

  • LP Certificate complete?

  • Date of LP Certificate

  • Did the Lightning Protection pass inspection?

  • Please provide details

  • Fall Arrest Certificate complete?

  • Date of Fall Arrest Certificate

  • Did the Fall Arrest pass inspection?

  • Please provide details

PPM Visit Report

  • INSTRUCTIONS

    1. Please answer all questions.
    2. Add photos and notes by clicking on the paperclip icon.
    3. Complete audit by providing digital signature.
    4. Share your report by exporting as PDF.

1 - Site Access

  • Please include pictures of the access route from the road to the site as per As Built Drawings

  • 1.1 Can the site be accessed following the access route shown on the drawings?

  • 1.2 Is there adequate lighting along the access route?

  • 1.3 Is the access route to site clear of obstacles?

  • 1.4 Are there any drainage issues to prevent year round site access?

  • 1.5 Is there adequate vehicle access and safe parking?

  • 1.6 General Comments

2 - Trees

  • 2.1 Are there localized trees within the "Fall Zone" of site?

  • 2.2 Please supply photos of trees around the site and compound

  • 2.3 What is the approximate height of the trees? (m)

  • 2.4 What is the distance of the trees from site? (m)

  • 2.5 Are there any overhanging branches near the site?

  • 2.6 Are there any signs of damage to the tree trunk or main branches of trees near to the site?

  • 2.7 Is there any remedial actions required?

  • When does this remedial work need to be completed by? (i.e. urgently or next PPM)

3 - Site/Compound

  • Please provide pictures of the site/compound

  • 3.1 Is the site fenced?

  • 3.2 Is the padlock on the gate installed?

  • 3.3 Please provide the new padlock code (Note: please call the Access Team with the new code on the day of the visit on 0044 1590 670025) Lock must either be Squire or iLoq, all other locks need to be replaced and all padlock codes on site must be different.

  • 3.4 Are the fence posts secure, stable and in good condition?

  • 3.5 Do the gate pins, bolt & socket allow the gate to operate smoothly?

  • 3.6 Is the fence in good condition and the site secure?

  • 3.7 Are all barriers/bollards/handrails in good condition?

  • 3.8 Is there any evidence of water ponding on concrete surfaces?

  • 3.9 Is the concrete damaged at any location?

  • 3.10 Is the site free from slips, trips and fall hazards?

  • 3.11 Is there algae on site? E.g. on the structure or cabinets

  • Please can you confirm if this has been removed?

  • Please advise why this was not removed.

  • 3.12 Is the site/compound free from waste, vegetation, vermin/pest infestations?

  • 3.13 Has weed killer been applied where required?

  • 3.14 Is the equipment installed as per the drawings?

  • 3.15 Are covers fitted to cable ladders / trays where cables are likely to be stepped across? (Only applicable for open Greenfield sites, if equipment is within a compound please select N/A)

  • 3.16 Are there cable management systems installed and used correctly?

  • 3.17 General comments

4 - Meter Cabinet/Electrical Installation

  • Please only answer this section based on the Shared Access EMC

  • Please provide pictures of the meter cabinet(s)

  • 4.1 Are the doors of the EMC securely lockable with a padlock fitted?

  • 4.2 Please provide the new padlock code (Note: please call the Access Team with the new code on the day of the visit on 0044 1590 670025) Lock must either be Squire or iLoq, all other locks need to be replaced and all padlock codes on site must be different.

  • 4.3 Has Bitumen been applied to foundation of the cabinet?

  • 4.4 Are all ducts foamed and sealed?

  • 4.5 Are there any signs of water ingress?

  • 4.6 Is the DNO/REC equipment in good condition?

  • 4.7 Are all devices in the EMC labelled correctly?

  • 4.8 Are the sub-main supply cables installed with tags at both ends?

  • 4.9 Are the correct breakers installed as per the drawings?

  • 4.10 Is the internal earth bar correctly installed and all connections labelled in a secure & permanent manner?

  • 4.11 Is the generator socket and changeover switch in good condition?

  • 4.12 What is the condition of the distribution board?

  • 4.13 Are the power cable(s) as per the drawings?

  • 4.14 Are all unused cable glands sealed?

  • 4.15 Are the earthing connections to all other cabinets as per the drawings?

  • 4.16 Are all covers fitted securely to all live parts?

  • 4.17 Is the external condition of the enclosure & finish acceptable with no signs of damage?

  • 4.18 General comments

5 - Operator Cabinets

  • Please only include third party cabinets, maintenance of the operator cabinets is the responsibility of the operator, therefore any issues that require immediate action should be reported to Shared Access on the date of visit so we can notify the operator.

  • Please provide pictures of the cabinets

  • 5.1 Are all cabinet doors & panels secure and locked?

  • Has this been reported to Shared Access on the date of visit? If not please ensure this is done.

  • 5.2 Are all cabinets the correct type & colour?

  • 5.3 Has Bitumen been applied to the foundation of the cabinets?

  • 5.4 Have all the ducts been foamed and sealed?

  • 5.5 Are there any signs of water ingress?

  • 5.6 Is the external condition of the enclosure & finish acceptable with no signs of damage?

  • 5.7 General comments

6 - Lightning Protection

  • Please provide pictures of the LP installation

  • 6.1 Is the LP installed as per the drawings?

  • 6.2 Is there LP bonding to compound/MUGA fence?

  • 6.3 Is there LP bonding to the structure?

  • 6.4 Are all steelwork items bonded to the LPS?

  • 6.5 Is the LP surface mounted/visible?

  • 6.6 Are all exposed earthing tapes PVC coated?

  • 6.7 Are all earthing tape runs straight?

  • 6.8 Are all changes in direction 90deg with proprietary joints?

  • 6.9 Are earth tapes labelled in earth pits?

  • 6.10 Has denso tape/contact paste been applied to all external LP connections?

  • 6.11 General comments

7 - Structure

  • Please provide pictures of the structure

  • 7.1 Does the galvanising/painted finish appear in good condition?

  • 7.2 Are there any visible signs of damage on the structure?

  • 7.3 Are the access hatches secure and operational?

  • 7.4 Are the holding down bolts visible?

  • 7.5 Is there any damage/corrosion to the HDB?

  • 7.6 Are the HDB secure and tight?

  • 7.7 Has denso been applied on all HDB?

  • 7.8 Are all welds at the base of the structure free from cracks?

  • 7.9 Are all antennas, MHA's, RRU's and combiners correctly secured?

  • 7.10 Are all dish/GPS/CCTV brackets in good working order with no visible signs of corrosion?

  • 7.11 Is the structure designed to be climbable?

  • 7.12 Has the fall arrest system been installed as per the manufacturers recommendations?

  • 7.13 Is the system tagged & in date?

  • 7.14 Is the structure safe to climb?

  • 7.15 Is an anti-climb guard installed with padlock fitted & functional?

  • 7.16 Please provide the new padlock code (Note: please call the Access Team with the new code on the day of the visit on 0044 1590 670025) Lock must either be Squire or iLoq, all other locks need to be replaced and all padlock codes on site must be different.

  • 7.17 What is the condition of the system / cable?

  • Did you take a MEWP to site?

  • Is the equipment at height free from rust?

  • Is the equipment at height in full working order and secure?

  • 7.18 Are there floodlights installed on the structure?

  • 7.19 Is the floodlight bracket in good condition?

  • 7.20 Is the bracket installed at the height shown on the drawings?

  • 7.21 Is there any evidence of bird nesting?

  • 7.22 Please confirm where the bird nesting is located?

  • 7.23 General comments

8 - Floodlights

  • 8.1 Is this site a floodlight installation? (Only answer this question if you are attending the following sites, Sherringham High School, Hadleigh United FC, Chatham Town FC, Nelson RFC, North Tawton Rugby Club or Llangefni Town Football Club, for any other site select N/A)

  • 8.2 Please provide pictures of the floodlight column(s), including internal and external pictures of the floodlight cabinet(s)

  • 8.3 Do the floodlights work when switched on?

  • 8.4 Are all light bulbs operational?

  • 8.5 Please provide details of the bulbs that need replacing

  • 8.6 Are all floodlight columns free from visual defects?

  • 8.7 Are the external hinge components in good condition and sufficiently greased?

  • 8.8 Is the meter cabinet & control cabinet free from damage, defects or water ingress?

  • 8.9 Is the LP connected to the floodlight cabinet(s) in good condition?

  • 8.10 Are there any obvious visual defects of the control gear within the floodlight cabinet?

9 - Signage

  • Please remove any signage from the site that does not relate to the telecoms equipment

  • Please provide pictures of the signage

  • 9.1 Has Shared Access H&S signage been installed on the EMC?

  • 9.2 Has Shared Access H&S signage been installed on the structure?

  • 9.3 Has Shared Access H&S signage been installed on the compound gate?

  • 9.4 Has Shared Access H&S signage been installed on the floodlight switch gear cabinet?

  • 9.5 Is all operator signage installed as per the drawing?

  • 9.6 General comments

10 - Other

  • Please ensure all padlocks are replaced with either Squire or iLoq padlock

  • 10.1 Have any padlocks been replaced?

  • 10.2 How many new padlocks have been replaced?

  • 10.3 Have any signs been replaced?

  • 10.4 Please detail the signs that have been installed

  • 10.5 Please can you confirm that the PPM to do list has been completed, as well as any extra reactive bolt on tasks?

  • 10.6 Please advise why this was not completed?

  • 10.7 Is the site in a high risk area, i.e. prone to vandalism or anti social behaviour?

  • 10.8 Has the vegetation been cleared? This should be cleared up to 1m from demise.

  • 10.9 Please advise why this has not been cleared?

  • 10.10 Please include any other information that needs highlighting here

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.