Information
-
Site
-
Conducted on
-
Prepared by
-
Personnel
-
Location
QUALITY
-
Current drawings being used
-
Superseded drawings marked, clipped together and separate current drawings
-
Document register in file & matches documents on site
-
Inspection test plan is up to date
-
Evidence of one ITP follow through
-
Site administration SF 4.8 - 1.1a signed off
-
Non-conforming items in quarantine area, tagged and recorded
-
Calibration dates on equipment current
HSEQ CONTROL (OSH Act 1984 Section 19, OSH Regulations 1996 3.1-3.2, Environmental Protection Act 1986 Section 72)
-
Current HSEQ management plan is available
-
Start up risk assessment available and relevant actions signed off
-
Induction register is up to date
-
Daily sign in register being used
-
Pre shift agenda being conducted daily
-
Supervisor OHS weekly checklist being used
-
Safety, Environmental & Quality policies are displayed
-
JSEAs conducted as per SMP
-
Work conducted as per JSEA and all workers signed on
-
Safe Work Method Statement available and operators signed on
-
Fuel truck in designated area
-
Dust suppression in use
-
Visible dust along boundary
-
Permits and licenses in place
-
Implementation on controls from two items under significant risk register
EMERGENCY ( OSH Regulations 1996 3.8-3.12)
-
First aid box is on site where signs indicate
-
First aid box is fully stocked
-
Trained first aiders are on site and are identified
-
Evacuation plan is displayed
-
Assembly muster point sign is up
-
Emergency contact number is displayed
-
Fire extinguisher in compound available and in date
WORKSITE MANAGEMENT (OSH Regulations 1996 3.1)
-
Site communication methods displayed (UHF Channels)
-
Site fencing is intact (if main contractor)
-
Works undertaken on/or adjacent to public road has relevant signage and TMP
-
Traffic management on site matches TMP (if applicable)
-
Traffic management plan is relevant to the stage of works
PUBLIC SAFETY ( OSH Act 1984 Section 20-22, OSH Regulations 3.17)
-
Site entrance signage in place (if principle contractor)
-
Construction materials kept within the workplace
-
Trip hazards managed and removed for public safety<br>
-
Public access controlled
-
Site perimeter fencing or barricades erected
-
Warning signs in place
BARRICADES (OSH Act 1984 Section 20, OSH Regulations 1996 3.6-3.8, 3.11 & 3.17)
-
Works adjacent to public thoroughfare de-marketed/ barricaded
COMPOUND (OSH Regulations 1996 3.6-3.8, 3.11 & 3.17)
-
Compound signage in place
-
Compound fence in tact
-
Site containers are neat and tidy (floors free of spills and obstruction)
-
List the chains and slings on site. Check for in services tags & in good condition. Damaged items in quarantine area and tagged out of service.
-
Toilets facilities are clean and well maintained
-
No smoking stickers outside crib room and office
-
Designated smoking areas enforced
-
Litter is placed in bins; bins are emptied regularly
CHEMICAL AND HAZARDOUS SUBSTANCES (OSH Regulations 1996 Part V)
-
Chemicals are storied in bunded area
-
Chemicals are stored in original or clearly labeled containers
-
Spill cleanup equipments available
-
Hydrocarbons stored in areas of containment
-
MSDS are available for all chemicals
PERSONAL PROTECTIVE EQUIPMENT WORN (OSH Regulations 1996 3.32, 3.40-3.44)
-
High visibility clothing worn
-
Hearing protection
-
Footwear
-
Eye protection
-
Head Protection
-
Sunscreen
TAGGING PROCEDURES (OSH Regulations 1996 4.38)
-
Danger tags & out of service tags available and being used
-
Out of service equipment is in quarantined area and isolated from use
LIGHT VEHICLES (OSH Regulations 1996 3.1)
-
Rotating yellow/orange light working
-
First aid box required
-
Seat belts in good condition and in use
-
Vehicles parked in correct area
-
Pre starts being completed
WELDING AND CUTTING (OSH Regulations 1996 3.27)
-
Hot works permit used
-
Equipment in good operating condition
-
Work area is clear of combustible material
-
Operator using PPE
-
Correct type of fire extinguisher near by
-
Gas cylinder secure and upright
-
Gas lines protected and in good condition
-
Double flash back arrestors
-
Welding/cutting screens used
ELECTRICAL (OSH Regulations 1996 3.59-3.65, 4.38 & AS/NZS 3012:2012)
-
Permanent live boards locked
-
Covers used correctly
-
Temporary boxes numbered
-
Insulated tie bars in place
-
Electrical tools and leads tagged, RCD used
-
Electrical leads raised
OVERHEAD POWERLINES (OSH Regulations 1996 3.64)
-
Electrical clearances over main access roads to job e-mailed to sub contractors
-
Permit to work under lines available and implemented
-
Danger zone clearances measured and displayed
EXCAVATION (OSH Regulations 1996 3.109-3.113)
-
Adequate access to excavation
-
Shoring erected
-
Excavation sides battered / benched
-
Adequate barriers and signs on excavation
-
Spoils being used as windrow of adequate size and protects workers from driving into excavation
-
Adequate distance between stacked material and excavation edge
-
Adequate distance between passing traffic and excavation edge
RETAINING WALLS
-
Mobile plant clearance area away from wall
-
Safety fencing if required
PLANT EQUIPMENT (OSH Regulations 1996 Part IV)
-
Pre-start books completed on a sample of plant
-
Observation of pre-start being conducted
-
Rotating yellow/orange light working
-
Reverse beepers working
-
Fire extinguisher in date and good order
-
Seat belts in good condition and in use
-
Two way radio in working order
-
Steps and grab rails in good order
-
Hire plant in good condition
GENERAL
-
Add media
-
Add media
CORRECTIVE ACTION (IMMEDIATELY)
-
Supervisor items to action
-
HSEQ items to action
-
Workshop items to action
-
Subcontractor (Drainage Supervisor to sign off if available)
-
Subcontractor (Wall Builder supervisor to sign off if available)
-
Subcontractor (other - list company name) Supervisor to sign off if available
CORRECTIVE ACTIONS WITHIN 7 DAYS (That require close out confirmation by HSEQ Coordinator)
-
Corrective action 1
-
Corrective action to be actioned by
- supervisor to action
- project manager to action
- workshop to action
- HSEQ to action
- subcontractor drainer to action
- subcontractor wall builder to action
- subcontractor -other to action
-
Corrective action 2
-
Corrective action to be actioned by
- supervisor to action
- project manager to action
- workshop to action
- HSEQ to action
- subcontractor drainer to action
- subcontractor wall builder to action
- subcontractor -other to action
-
Corrective action 3
-
Corrective action to be actioned by
- supervisor to action
- project manager to action
- workshop to action
- HSEQ to action
- subcontractor drainer to action
- subcontractor wall builder to action
- subcontractor -other to action
-
Corrective action 4
-
Corrective action to be actioned by
- supervisor to action
- project manager to action
- workshop to action
- HSEQ to action
- subcontractor drainer to action
- subcontractor wall builder to action
- subcontractor -other to action
-
Corrective action 5
-
Corrective action to be actioned by
- supervisor to action
- project manager to action
- workshop to action
- HSEQ to action
- subcontractor drainer to action
- subcontractor wall builder to action
- subcontractor -other to action
-
Corrective action 6
-
Corrective action to be actioned by
- supervisor to action
- project manager to action
- workshop to action
- HSEQ to action
- subcontractor drainer to action
- subcontractor wall builder to action
- subcontractor -other to action
CORRECTIVE ACTIONS GREATER THAN 7 DAYS (close out to be determined by HSEQ Management on corrective actions register)
-
Corrective action 1
-
Corrective action to be actioned by
- supervisor to action
- project manager to action
- workshop to action
- HSEQ to action
- subcontractor drainer to action
- subcontractor wall builder to action
- subcontractor -other to action
-
Corrective action 2
-
Corrective action to be actioned by
- supervisor to action
- project manager to action
- workshop to action
- HSEQ to action
- subcontractor drainer to action
- subcontractor wall builder to action
- subcontractor -other to action
-
Corrective action 3
-
Corrective action to be actioned by
- supervisor to action
- project manager to action
- workshop to action
- HSEQ to action
- subcontractor drainer to action
- subcontractor wall builder to action
- subcontractor -other to action
-
Corrective action 4
SIGN OFF
-
RJV On site representative
-
Auditor