Safety Documentation and Training
Safety Documentation
-
Is there a suitable updated and reviewed Health and Safety Construction Stage Plan?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Notification Forms, in compliance with relevant jurisdiction requirements, submitted and posted at suitable locations? e.g. AF1, AF2, F10 etc.
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are suitable H&S Statements available for Subcontractors?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are method statements/Risk Assessments available for required activities?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are pre task briefings given and signed off by relevant persons?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are toolbox talks given on a regular basis?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are required Statutory inspections on file, ensuring Legislative compliance in the relevant jurisdiction: e.g. AF3, AF4, GA1, GA2, GA3, Excavations Insp's, W@H Insp's, PFD Insp's etc.
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are site safety meetings taking place?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is there a safety notice board displayed on site?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Does the site comply with the Roadbridge IMS system, or Project approved Management System?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are Site Safety Tours being completed and findings recorded?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is there a formal Behavioral Based System employed for the site and is it accessible to all?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are issues identified by Site Safety Tours which require corrective action addressed and signed off?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are required documents completed on Go Formz where possible?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are "Box" folders maintained accordingly and updated in alignment to Project Safety Folders
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Training
-
Is it evident that a site induction has been given to all who attend site?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is there compliance with "Mandatory Safety Training" as per Jurisdiction requirements? E.g. Safepass, CSCS, CPCS, NPORS etc.
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is there evidence of Manual handling training for all Personnel incl. Subcontractors?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks:
-
Add media
Welfare & First Aid
Welfare
-
Are the number of toilets/urinals sufficient for number of site operatives?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are facilities adequately supplied?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are separate drying/changing rooms available?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are the facilities kept clean and clear of clutter?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is suitable canteen facilities provided incl. drinking water?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
First Aid
-
Appropriate numbers of First Aiders Provided?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
All Contents of First Aid box within Expiry dates? Contents Clean, Tidy & Orderly? Evidence of regular checks on file?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Records of First Aid incidents kept and available?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Emergency Numbers & First Aid List created and displayed publicly?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks:
-
Add media
Site Security & Public Roads/Footpaths
Site Securtiy
-
Is the site adequately secured?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is all reasonable care taken to prevent unauthorised entry so far as is reasonably practical?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Adequate warning and construction related signage in place?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Public Roads/Footpaths
-
Are work areas adjacent to live Traffic/Pedestrian areas appropriately signed and protected?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Dust Suppression used if required?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is the public protected from Falling Materials?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks
-
Add media
Site Access/Egress & Pedestrian Segregation
Site Access/Egress
-
Is safe access provided to reach each place of work?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are all excavations/opes adequately fenced and signed accordingly?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are measures in place to protect people from falling at leading edges?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are ladders in good condition, positioned correctly and secured?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is lightning appropriate for access and task completion?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is the site generally tidy and free from avoidable slip/trip hazards?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are measures in place to allow pedestrian segregation from Plant & Vehicles?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Pedestrian Segregation
-
Are Pedestrian routes clearly identified and demarcated?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are office areas suitably protected from Plant activities?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are measures in place to prevent unauthorised access to work areas?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks
-
Add media
Fire Precautions and Emergency Preparedness
Fire Precautions
-
Has a suitable Fire plan been drawn up and communicated?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are suitable fire extinguishers/detection devices available at the place of work and clear of obstructions?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is the amount of flammable liquid present at the workplace kept to a minimum for the days work and is it stored safely?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are Fire Extinguishers/Blankets inspected within the past 12 months?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Emergency Preparedness
-
Site Evacuation Plan in place and tested?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Emergency Drill appropriate to work activities carried out?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Emergency access routes clear and doors/gates unlocked?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are gas bottles adequately stored/secured in an upright position?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks:
-
Add media
Confined Space Working
Confined Space
-
Has a MS/RA been conducted to determine the risks associated with confined space entry?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is the Confined Space Access controlled under a Permit to Work System?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Have the relevant personnel confined space training?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is there a documented Rescue plan in place?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks:
-
Add media
Lifting Operations/Plant and Equipment
Lifting Operations
-
Are checks carried out to ensure that statutory inspections of all lifting equipment/appliances are carried out and records kept on site?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Do all crane/plant operators hold proof of required training ?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are all lifting operations managed at the workplace by trained slinger/signaller?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
For Excavators being used as cranes, is SWL sticker posted appropriately & Check Valves fitted?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Plant & Equipment
-
Have machines with restricted view been fitted with suitable reversing aids e.g. Side Mirrors/Rear convex mirrors/CCTV/Motion Sensor Alarms etc.?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Daily Inspections carried out by operator?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Flashing Beacons in use?<br>Seat Belts worn by operators?<br>Keys removed when not in use?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is the plant & equipment deemed safe for use? (No damaged/missing guards etc.)
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks:
-
Add media
Permit Requirements
Permit Requirements
-
Are permits being adhered to?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is there works taking place outside the prescribed permit system in error?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is there a documented Permit to Work system where required?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks:
-
Add media
Excavations
Excavations
-
Has the area been scanned for cables/services?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are Excavation works controlled by a Permit to work System?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Have operatives received training in the use of cable avoidance tools and equipment?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Have measures been taken to prevent the collapse of excavations where needed?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Have measures been to taken to prevent vehicles from overrunning into the excavations where required?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are excavations subjected to required Jurisdiction statutory inspections and records available? E.g. AF3 etc.
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is a safe means of access and egress provided?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks:
-
Add media
Demolition/Asbestos
Demolition
-
Has an adequate PRE-demolition survey/Risk assessment been carried out?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Has a suitable demolition plan been drafted?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is a system in place to ensure that demolition operatives are competent?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Asbestos
-
Have the appropriate notifications to the relevant authorities been made?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Has a plan for the management of asbestos been drawn up?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks:
-
Add media
Use of Chemicals & General PPE Compliance
Use of Chemicals
-
Are SDS sheets available for hazardous substances?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are containers labeled and stored safely?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are PPE requirements identified and complied with for using Chemicals?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are COSHH/REACH or equivalent assessments available?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
General PPE Compliance
-
PPE is suitable for the Task?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
PPE register is available and up to date?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Appropriate PPE is been worn according to Site Rules?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks
-
Add media
Work at Height, Scaffold, Harness & Ladders
Work at Height
-
Has the work at height been adequately assessed including a rescue plan in place?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is "collective protection" for work at height employed where practical?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are MEWP's used safely?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Scaffold
-
If required, is there a temporary work design for the Scaffold?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is the Scaffold inspection in date?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are Scaffolders trained and CSCS/CPCS or equivalent tickets in the site file?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Harness
-
Are Harnesses in good condition and colour coded appropriately?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Weekly inspection Documented and statutory Inspection completed, in date and kept on file?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Items appropriately colour coded?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Harness Training completed for required personnel?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Ladders
-
Ladders used in appropriate fashion?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Ladder Risk assessment in place for works off ladder?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Weekly inspection of ladder on file?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Ladders in good condition.
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks
-
Add media
Hot Works, LOTO Procedures & Unsafe Practices
Hot Works
-
Are required controls in place?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is the PPE adequate for the task?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are hot works controlled by the PtW system?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
LOTO
-
Appropriate system in use linked to Permit System?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Designated person in place controlling LOTO Procedure?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Unsafe Practices
-
Are workers only smoking in designated areas?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is there a segregated smoking areas for those wishing to use e-cigarettes?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Have vehicles been observed travelling at a safe speed?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Was an Unsafe system of work/practice witnessed?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks
-
Add media
Housekeeping
Housekeeping
-
Walkways free of debris and storage?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Work areas free of slip/trip hazards?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Stairs free of slip/trip hazards?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
All excess material stored appropriately or skipped appropriately?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Signs clean, visible and in good condition?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
General Housekeeping in good condition?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Equipment/Material properly stored?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks
-
Add media
Electrical Equipment & Power tools
Electrical Equipment
-
Have all portable electrical appliances been PAT tested?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
110v system used or cables protected using armored cable following Risk Assessment?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Are overhead power lines protected in compliance with Jurisdiction relevant COP's/Guidance?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Is all Electrical equipment witnessed in good condition? No visible damage to cables, leads etc.?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
Power Tools
-
Power Tools in good working condition. Housing and leads in place. All guards in place?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Vibration monitoring employed where required?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Earthing appropriate to equipment employed?
-
Action Required to correct issue:
-
Action by Whom:
-
Date for action to be completed by:
-
Remarks
-