Site Information
-
Prepared by
-
Position
-
Conducted on
-
Document No.
Design Drawings.
-
Are Designs Available for structures that are non standard?
-
Has the scaffold been erected in accordance with the design provided?
Handovers
-
Are all handover and weekly scaffold inspection up to date and filed
Joint Visual Inspection
Handrails, Toe boards, Brick guards & Netting
-
Are handrails and toe boards fitted where there is a risk of persons or materials falling?
-
Are handrails and toe boards fitted correctly and at the correct height? (950mm High, no gap greater than 450mm)
-
Are brick guards in a good condition and suitably secured?
-
Is the debris netting fitted correctly and in good condition?
Ladder/stair access, scaff tags and signage.
-
Is the means of access suitable ?
-
Are scaff tags located at all access points of the scaffold and in date ?
Housekeeping.
-
Have all spare materials been cleared from the scaffold lift ?
-
Is there a suitable scaffolding material lay down area and is it in a tidy condition?
Projecting tubes.
-
Have all projecting tubes been kept to a minimum and protective caps fitted?
Summary.
-
MCL Representative
-
Craven Representative.