Inspection check list
-
Brickwork is to the standard and quality set out in the approved sample panel.
-
Blockwork is to the standard and quality set out in the approved sample panel.
-
Wall ties, l-shaped ties, head restraints and other steel sundries are installed correctly .
-
All insulation and fire barriers or fire batts are installed correctly.
-
All horizontal and vertical DPCs are installed correctly and to specification.
-
Weep vents and/or air bricks are installed correctly.
-
Brickwork and blockwork is set out correctly to line and gauge.
-
All openings are correct to current drawings and have been set to the height and position required.
-
Have all cavities been cleaned and are free from debris.
-
Are all concrete or steel lintels installed correctly to position and height.
-
Are all heads of walls closed and sealed as per architects requirements.
-
All mansory support has been installed and torque settings checked to correct settings.
-
All pistol bricks have been fitted to the required coursing height.
-
DPCs are installed in the correct heights and positions.
-
Photos are available for this inspection or handover.
This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Rosedale Brickworks responsibility until practical completion has been achieved.
-