Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Area relating to sign off

  • Add media

  • Drawing Number

  • Material's used

  • Spec or ITP reference

Audit

General Visual Inspection check list

  • Brick/Blockwork is to the standard and quality set out in the accepted sample panel/sample wall and built to the materials required in the spec

  • Brick/Blockwork is set out correctly to the dimensions on the current drawings

  • All openings are set out to the current drawings and have been built to the correct size

  • Are all concrete or steel lintels installed at the correct heights

  • If lintels are pre-made have they been pointed

  • Type of bond is correct and continuous as required in spec

  • Walls are plumb and level to the tolerance set out in the Spec

  • Facebricks have been mixed to avoid patches

  • All face work is clean and free from defects

  • Work has been properly protected from frost/rain

  • Have cavities been cleaned and are free from debris

  • Photos are available for this inspection or handover.

Brick Support and Windposts

  • Is windpost installed in the correct position

  • Is windpost plumb

  • Are fixings installed correctly

  • Is Brick support installed correctly and to current drawing

  • Is correct torque setting applied as the drawing

  • Is cast in slab in at correct level

  • If no have extra bolts been drilled in

  • Photos are available for this inspection or handover.

DPC and sundries

  • Which DPC is being used and Spec reference

  • All Tray DPCs at slab levels are installed correctly and sealed to specification

  • DPCs above doors or windows are installed at the correct heights and positions either internally or externally

  • Is there a VCL fixed instead of dpc

  • Weep vents and or air bricks are installed correctly

Wall ties and Movement Joints

  • Wall ties, L-shaped ties, are correct to the Spec

  • Wall ties or L Shape ties are installed at the correct centres

  • Are wall ties clean

  • Are wall ties out the correct distance

  • Installation of bed joint reinforcing is in at the correct centres as indicated on the drawings

  • Movement joint ties are installed with sleeve

  • Movement joints are in the correct position on the current drawings

  • Has the correct expansion joint been installed

  • Head restraints has been installed and at the correct distance apart

  • Photos are available for this inspection or handover.

Firestops

  • Which type of fire stop is being used at Slab level and for Vertical barriers and Spec ref

  • Has fire stop been installed in the correct vertical posistion

  • Has fire stop been installed correctly at slab level

  • Which type of fire stop is to be used around doors and windows if different for slab level

  • Has fire stop/fire sock been installed correctly around windows and doors

  • Has fire stop been installed correctly around balcony brackets or other areas where required

  • Photos are available for this inspection or handover.

Insulation

  • Is the correct insulation installed as per the spec

  • is insulation retained using correct clip

  • is insulation correctly sealed using silver tape or other sealant

  • Is insulation cut back enough around windows/doors to allow for firestop

  • Does wall require thermal block

  • If required has DPM or other waterproof been laid first

Builders Work Holes/Outlets

  • Have Builders work holes/outlets been marked by others

  • Builders work holes/Outlets have been installed correctly to drawings issued at the time

  • Do Builders work holes/outlets have the correct lintel installed

  • Photos are available for this inspection or handover.

Coping Stones, Brick-on-edge to tops of walls

  • Has DPC been installed under coping

  • Has coping stone restraint/dowel been installed as per drawing and at correct centres

  • Is coping stone installed correctly with correct overhang and drip detail

  • Photos are available for this inspection or handover.

Snagging

  • Has work had an initial snag

  • Have walls been scrapped clean

  • Have damaged or defective blocks/bricks been identified

  • Has corrective work been carried out.

  • Have pin holes/missed pointing been identified

  • Has corrective work been carried out

  • Has Mastic been completed to a satisfactory Standard

  • Are wall cleaned down and free from defects.

  • Have scaffold tie holes been infilled and all items required e,g DPC, firestop, weep holes been installed

  • Has work had final snag by main contractor

This inspection sheet confirms that the item or area detailed above is 100% completed in line with the current specification, drawings and pre agreed sample panels although still remaining Rosedale Brickworks responsibility until practical completion has been achieved.

  • Signed on behalf of Rosedale Brickwork

  • Signed on behalf of Main Contractor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.