Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Materials,Spec and inspection area
-
Drawing No
-
Materials used
-
Spec or ITP Reference
-
Area relating to inspection
Inspection check list
-
Has area to been repaired identfied by others
-
Is repair to Brickwork
-
Is repair to Blockwork
-
Is repair to an existing hole
Brick/Blockwork
-
Has brick/blockwork been toothed out back to solid brick/blockwork.
-
Have damaged bricks/blocks been replaced/repaired to match existing
-
Does the area around the repair required re-pointing
-
Have bed and perp joints been raked out to depth specified
-
Before infilling has area been dampened to avoid rapid drying
-
Has mortar been compacted into the joints
-
Has top joint where infill mets existing has top joint been pack correctly.
Repair
-
Is repair in line with existing brick/blockwork
-
Are bed and perp joints consistent with area being repaired
-
Is repair bonded
-
Have ties been used.
-
Are ties L shape
-
Have cavity ties been used
This inspection sheet confirms that the item or area detailed above and on all related inspection sheets is 100% completed in line with the current specification, drawings, pre agreed sample panels and ITP's although still remaining Harlequin Brickworks responsibility until practical completion has been achieved.
-
Signed on behalf of Harlequin Brickwork
-
Signed on behalf of Main Contractor