Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Materials,Spec and inspection area

  • Drawing No

  • Materials used

  • Spec or ITP Reference

  • Area relating to inspection

Inspection check list

  • Has area to been repaired identfied by others

  • Is repair to Brickwork

  • Is repair to Blockwork

  • Is repair to an existing hole

Brick/Blockwork

  • Has brick/blockwork been toothed out back to solid brick/blockwork.

  • Have damaged bricks/blocks been replaced/repaired to match existing

  • Does the area around the repair required re-pointing

  • Have bed and perp joints been raked out to depth specified

  • Before infilling has area been dampened to avoid rapid drying

  • Has mortar been compacted into the joints

  • Has top joint where infill mets existing has top joint been pack correctly.

Repair

  • Is repair in line with existing brick/blockwork

  • Are bed and perp joints consistent with area being repaired

  • Is repair bonded

  • Have ties been used.

  • Are ties L shape

  • Have cavity ties been used

This inspection sheet confirms that the item or area detailed above and on all related inspection sheets is 100% completed in line with the current specification, drawings, pre agreed sample panels and ITP's although still remaining Harlequin Brickworks responsibility until practical completion has been achieved.

  • Signed on behalf of Harlequin Brickwork

  • Signed on behalf of Main Contractor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.