Materials,Spec and inspection area
-
Drawing No
-
Materials used
-
Spec or ITP Reference
-
Area relating to inspection
Inspection check list
-
Has area to been repaired identfied by others
-
Is repair to Brickwork
-
Is repair to stone work
-
Does repair need mechanical/heli-bar repair
Brickwork
-
Have damaged bricks been replaced/repaired to match existing
-
Does the area around the repair required re-pointing
-
Have bed and perp joints been raked out to depth specified
-
Before infilling has area been dampened to avoid rapid drying
-
Has mortar been compacted into the joints
-
Will the re-pointing match the existing work
-
Are the repairs aesthetically pleasing.
Stone work Sill, Lintel, decorative works or copings
-
Has damaged stone work been repaired to match existing
-
Do the joints around and between the repair need raking out and repointing
-
Has the stone damaged stone been taken back to a sound surface.
-
Has the repair require installation of wire reinforcment
-
Will the repair require several visits to build it up to the required profile
-
Is the colour a good match
-
Are the repairs aesthetically pleasing
Heli-Bar repairs
-
Have the joints been cut out to the required depth to allow installtion
-
Has the resin and bar been installed significantly past the crack
-
Has the repair been pointed to match existing stone or brickwork
This inspection sheet confirms that the item or area detailed above and on all related inspection sheets is 100% completed in line with the current specification, drawings, pre agreed sample panels and ITP's although still remaining Rosedale Brickworks responsibility until practical completion has been achieved.
-