Title Page

  • Job Number

  • Location
  • Job Description

  • Prepared by

SWMS Document Details

  • What measures have been put in place to ensure control measures in this SWMS are implemented, monitored and reviewed?

  • Person responsible for monitoring and reviewing this SWMS?

  • Names of people consulted during the preparation of this SWMS

SWMS Tasks

High Risk Construction Activities

  • Select the relevant High Risk Activities that is being covered by this SWMS

  • NOTE: If activity isn't listed as a High Risk Construction Activity - a SWMS is not required.

Risk Matrix

  • This Risk Matrix is to be used to determine risk rating prior to control measures and again after control measures are applied. Any rating of "High Risk" is unacceptable and requires further control measures applied.

    Risk Matrix & Consequence Categories.png
  • Job Activity/Task
  • Activity / Task

  • If Other - Describe the Activity/Task

  • Potential Hazards & Risks

  • If Other - List Potential hazards & Risks

  • Risk Rating

  • Control Measures

  • If Other - List additional Control Measures

  • Residual Risk Rating

  • Person Responsible

Relevant Legislation & Competencies

  • Legislation & licences.png

Additional Comments (Optional)

  • Additional Comments (Optional)

Hazardous Chemical Register

    Hazardous Chemical
  • Name of Chemical & Storage Location

  • Issue Date of Safety Data Sheet

  • Additional Comments (Optional)

Signatures

    Signatures
  • Name & Signature

  • Date of Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.