Title Page
-
Project
-
Location
-
Job Description
-
Prepared by
SWMS Document Details
-
What measures have been put in place to ensure control measures in this SWMS are implemented, monitored and reviewed?
- Eliminate
- Substitute
- Isolate
- Engineering
- Administration
- PPE
-
Person responsible for monitoring and reviewing this SWMS?
-
Names of people consulted during the preparation of this SWMS
SWMS Tasks
High Risk Construction Activities
-
Select the relevant High Risk Activities that is being covered by this SWMS
- Operate aerial ignition equipment in an aircraft
- Operate chainsaws
- Operate side by side utility vehicle & Operate quad bikes
- Prescribed Fire Burns
- Working in proximity to dangerous wildlife and Crocodiles
- Remote and isolated location work
- Working Outside with exposure to natural elements for extended duration
- Working near water involves a risk of drowning
- Working with or near Plant & Equipment
- Operate vehicle over long distance
-
NOTE: If activity isn't listed as a High Risk Activity - a SWMS is not required.
Risk Matrix
-
This Risk Matrix is to be used to determine risk rating prior to control measures and again after control measures are applied. Any rating of "High Risk" is unacceptable and requires further control measures applied.
Job Activity/Task
-
Activity / Task
- Operate aerial ignition equipment in an aircraft
- Operate chainsaws
- Operate side by side utility vehicle & Operate quad bikes
- Prescribed Fire Burns
- Working in proximity to dangerous wildlife and Crocodiles
- Remote and isolated location work
- Working Outside with exposure to natural elements for extended duration
- Working near water involves a risk of drowning
- Working with or near Plant & Equipment
- Operate vehicle over long distance
-
If Other - Describe the Activity/Task
-
Potential Hazards & Risks
-
If Other - List Potential hazards & Risks
-
Risk Rating
-
Control Measures
-
If Other - List additional Control Measures
-
Residual Risk Rating
-
Person Responsible
Relevant Legislation & Competencies
Additional Comments (Optional)
-
Additional Comments (Optional)
Hazardous Chemical Register
- Hazardous Chemical
-
Name of Chemical & Storage Location
-
Issue Date of Safety Data Sheet
-
Additional Comments (Optional)
Signatures
- Signatures
-
Name & Signature
-
Date of Signature