Title Page
-
Location
-
PM#
-
Foreman
-
Crew Members
-
Prepared by
-
Customer
-
Conducted on
Daily Huddle
-
Morning Tailboard completed
-
Job Walked prior to start
General Verification
-
JSA has been completed and signed by all onsite personnel working for Miller Pipeline
-
USA Tickets Valid and onsite
-
Tab data for plates and shoring available on site
-
Utility standards on site/available
-
OQ cards/records on site/available
-
OQ's are valid for tasks to be performed
-
Span of control procedures properly followed
-
All subcontractors have their own JSA properly filled and signed by all onsite personnel
Behavior Safety
-
3 Point of Contact when accessing & exiting equipment
-
Bell Hole/Excavation large enough to perform work
-
Easing in/out of trenches without jumping
-
Team lift utilized
-
Communication between heavy equipment operator and spotter/other ground personnel when equipment is in motion
-
Pinch points identified on tools, equipment, etc.
-
Jobsite personnel distracted while in motion
-
Jobsite housekeeping is up to standard
-
Pipehorn used to verify nearby utilities
Excavation/Trench Safety
-
Excavation Daily Checklist completed
-
Competent Person present
-
Live utilities being hand dug around to prevent damage
-
Spoils 2ft or more from edge of excavation
-
Ramps/Steps/Ladders used in excavation 4ft or more in depth
-
Ladder 3ft above grade
-
Ladder inspected for defects
-
Ladder within 25ft in long trenches
-
Sloped/benched/ or Shored in excavation 5ft or more in depth
-
Water kept from accumulating in excavation
-
Gas Monitor in excavation when required
-
Gas Monitor calibrated
Protective Systems
-
Protective systems installed correctly according to Tab Data
-
All components of protective systems in good condition(no bent, dented, punctured, rusty, or leaky parts)
-
Trench is not occupied during installation
-
Tabulated Data on site & available
Plastic Pipe Joining & Testing
-
Static Protection used
-
Butt Fusion machine & Irons in good shape
-
E-Fusion Machine in good shape
-
Plastic Pipe prepped properly
-
Fuser ID Marked on pipe
-
Propper fusion iron temperature
-
Propper cooling time
-
Pipe fused properly
-
Soap tested
-
Pipe has been pressure tested
Service Replacement
-
Damage Prevention Checklist filled out prior to start
-
Control Point exposed prior to excavation
-
Control Point squeezed off prior to excavation
-
Pipehorn being used during excavation
-
Hot tank being utilized
-
Service line purged
-
Warning signs present prior to purging gas
-
Pipe properly fused
-
New service installed at proper depth
-
Riser installed to proper depth & location
-
Excess flow valve properly sized & installed
-
Meter set installed per customer requirements
-
New Service line properly pressure tested
-
Meter soap tested
-
Meter Protection Post installed properly
-
Worker performing Meter task has valid OQ
Traffic Control
-
Warning Signs properly placed/spaced
-
Traffic Control signs/barriers visible
-
Flaggers/traffic control personnel properly managing traffic
-
Equipment positioned as barrier
-
Adequate number of cones
-
Road plates installed correctly
-
Sidewalks/walkways provided for pedestrians and are cleared of debris
Open Trench Pipe Installation
-
Trench free from rocks/debris
-
Pipe installed at proper depth
-
Proper separation from other utlities
-
Tracer wire properly installed
-
Warning tape properly installed
-
Pipe properly compacted & backfilled
Heavy Equipment Operation
-
Heavy Equipment Checklist completed
-
Defects to machinery reported
-
Slings, chains, and cables in good condition
-
Plates transported properly
Hand & Power Tools
-
Tools in safe working condition
-
Proper tool for job
-
Security/Locking/Whip Checks on all hose and couplings
Vac Rigs
-
Static Protection used
-
Operator utilizing proper PPE
Directional Drilling
-
All crossing utilites potholed/verified
-
Ground Rod place
-
Dielectic boots worn when crossing power lines
-
LOTO or machine turned off when changing borehead, reamer, or connecting pipe
-
Bore path walked prior to drilling
-
Drill head inspected
-
Safe work zone around drill rig
-
Proper communication between operator and locator
-
Proper clearance between other facilities
Directional Drilling Pipe Installation
-
Weak link used per customer standards
-
Pipe Installed at proper depth
-
Warning tape installed in all potholes
-
Tracer wire installed properly
Health & Environmental
-
All container, gas cans, diesel cans are labeled
-
All container and compressed gas cylinder properly secured
-
Sewer drains properly protected from material contamination
-
Drinking water available
-
Work/rest periods utilized during elevated temperatures
-
First Aid Kit available and properly stocked
-
First Aid/CPR trained person on site
-
Epi-Pen on site for those allergic to bee stings
Fire Protection
-
Monthly Fire Extinguisher inspected
-
Fire extinguishers accessible/available
Work Truck/Cargo Van Organization
-
Cargo area organized and cleaned
-
Cab area organized and cleaned
-
Electrical
-
Each cord in good condition
-
GFCI's used at source of power
-
Electrical tools not used on live gas
-
Wet environments avoided with electric cords
Restoration
-
Landscape restored to prior condition
-
Holes have been patched with asphalt
-
Asphalt installed correctly
-
Round Up
-
Overall View of Job
-
Signature