1.0 - Previous Project Inspection
-
1.1 - Has the last job-site inspection been reviewed in preparation for this inspection?
-
1.2 - Are there any outstanding corrective actions to be taken?
2.0 General Conditions
-
2.1 - Perimeter fence in good condition?
-
2.2 - Traffic control maintained?
-
2.3 - Project signage posted?
-
2.4 - Danger and caution tape maintained?
-
2.5 - Adequate toilet facilities?
-
2.6 - Drinking water and cups provided?
3.0 - Housekeeping
-
3.1 - Appearance of job-site neat and orderly?
-
3.2 - Passageways and walkways clear?
-
3.3 - Projecting nails removed or bent over?
4.0 - Power and Hand Tools
-
4.1 - Are guards in place?
-
4.2 - Have employees received tool operation training and training documentation verified?
-
4.3 - Tools and cords in good condition?
-
4.4 - All mechanical safeguards in place?
-
4.5 - Right tools used for the job at hand?
-
4.6 - PPE appropriate for the tools used?
5.0 - Ladders
-
5.1 - Ladders secured to prevent movement?
-
5.2 - Extension ladders extend at least 3 foot above landing?
-
5.3 - Ladders used are in good condition?
-
5.4 - Ladders used properly?
-
5.5 - Has Ladder safety training been conducted with employees and documentation verified?
6.0 - Fall Protection
-
6.1 - Guardrails installed and maintained in good condition?
-
6.2 - Personal fall arrest equipment in good condition?
-
6.3 - Holes guarded and marked?
-
6.4 - Fall protection equipment inspected?
-
6.5 - Has fall protection training been conducted with employees and documentation verified?
7.0 - Scaffolding
-
7.1 - Have employees received scaffold safety training and documentation been verified?
-
7.2 - Scaffolds erected under supervision of a competent person?
-
7.3 - Scaffold grade lumber used and planks have proper overlap?
-
7.4 - Guys, ties and braces in place at 4:1 rule?
-
7.5 - Guardrail system in place?
-
7.6 - Access ladders in place?
-
7.6 - Cross bracing in place?
-
7.7 - Scaffold inspections completed each shift?
8.0 - Fire Prevention and Protection
-
8.1 - Fire extinguishers in place for general conditions and hot works?
-
8.2 - Monthly and annual inspections completed?
-
8.3 - Use of approved fuel/gasoline containers?
-
8.4 - Has fire extinguisher training been conducted with all employees required to use extinguisher and training verified?
9.0 - Excavations & Shoring
-
9.1 - Shoring of adjacent structures adequate?
-
9.2 - Banks of excavation sloped or shored correctly?
-
9.3 - Spoil piles at least 2 feet from edge of excavation?
-
9.4 - Access provided within 25 feet of employees in trenches?
-
9.5 - Competent person on site?
-
9.6 - Inspections performed?
-
9.7 - Excavation safety training been conducted with employees and training documentation verified?
10.0 - Equipment
-
10.1 - Backup alarms in place or signal person used?
-
10.2 - Seatbelts used in all mobile equipment?
-
10.3 - ROPS in good condition?
-
10.4 - Daily inspections performed?
-
10.5 - Operators trained and documentation verified?
11.0 - Cranes and Rigging
-
11.1 - Has the rigger received training and documentation has been verified?
-
11.2 - Is there a competent person onsite?
-
11.3 - Slings, hooks, shackles etc... in good condition?
-
11.4 - Outriggers used?
-
11.5 - Swing radius barricaded?
-
11.6 - 20 foot distance from power lines maintained or lines de-energized?
-
11.7 - Have all employees working around crane received training?
12.0 - PPE
-
12.1 - Respiratory program available?
-
12.2 - Respiratory training, fit test and equipment inspection recording been conducted and documentation verified?
-
12.3 - Personal Protection Equipment hazard assessment been conducted and documentation verified?
-
12.4 - Hard hats worn by all employees?
-
12.5 - Safety glasses used by employees?
-
12.6 - Proper hand protection in place?
-
12.7 - Proper footwear?
-
12.8 - Hearing protection used?
-
12.9 - Respiratory protection used?
13.0 - Electrical
-
13.1 - GFCI's used and tested on all 110 outlets?
-
13.2 - All extension cords 3 wire type, in good condition with ground pins?
-
13.3 - All power panels labeled?
-
13.4 - All panels have fronts and covers remain closed?
14.0 - Welding and Cutting
-
14.1 - Fire extinguisher at site of welding/cutting?
-
14.2 - Use and storage of cylinders acceptable?
-
14.3 - Housekeeping acceptable?
15.0 - Stairways
-
15.1 - Treads and landings acceptable?
-
15.2 - Handrails installed?
-
15.3 - Temp lighting in stairways acceptable?
-
15.4 - Housekeeping?
16.0 - Aerial Lifts
-
16.1 - Operators trained and documentation has been verified?
-
16.2 - Equipment in good condition?
-
16.3 - Gates and guardrails acceptable?
-
16.4 - Lifts used properly?
17.0 - Material Handling
-
17.1 - Material stacked, racked, etc...?
-
17.2 - Materials stored proper distance from floor openings?
18.0 - Powder Actuated Tools
-
18.1 - Employees trained and have card in possession?
-
18.2 - Proper eye and face protection used?
-
18.3 - Misfired cartridges properly disposed of?
-
18.4 - Hearing protection used?
-
18.5 - High noise signage posted in area?
19.0 - Administration
-
19.1 - Employee training records maintained?
-
19.2 - First aid kits available and maintained?
-
19.3 - SDS sheets available for review?
20.0 - Additional Hazards/Concerns or Safe Behaviors:
-
Hazard/Concern or Safe Behavior
-
20.1 - Hazard/Concern or Safe Behavior:
-
Photo(s) of Hazard/Concern or Safe Behavior:
-
Drawing of Hazard/Concern or Safe Behavior, if applicable:
21.0 - Sign Off
-
Marsh & McLennan Loss Control Representative's Signature: