Title Page

  • Address

  • Date

  • Tenant Name

  • Tenant Number

  • Tested By

  • Type of Test

Testing

  • Consumer Mains

  • Main Earth Continuity

  • Fault Loop

  • Insulation Resistance

  • Polarity

  • Operation of RCD

  • FAILED RCD 1 Trip

  • FAILED RCD 2 Trip

  • FAILED RCD 3 Trip

  • FAILED RCD 4 Trip

  • FAILED RCD 5 Trip

VISUAL INSPECTION AND OPERATION OF ELECTRICAL EQUIPMENT

  • Switchboard

  • Entry

  • Master Bedroom

  • Ensuite

  • Bedroom 1

  • Bedroom 2

  • Bedroom 3

  • Bedroom 4

  • Bathroom 1

  • Toilet

  • Garage

  • Study

  • Lounge

  • Living

  • Laundry

  • Kitchen

  • Pantry

  • External

  • Alfresco

  • Recommendation

SMOKE ALARMS

  • Number of Smoke Alarms

  • Location

  • is Smoke Alarm more than 10 years old?

  • Under Residential Tenancies Regulations 2021, smoke alarms will need to be replaced every 10 years.

  • Push Button Test

  • Smoke Spray

  • Recommendation

Safety Inspection Result

  • Overall Result

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.