THINK THROUGH THE DESIGN

  • Do you understand the design scope?

  • Do you have the relevant study/scope definition documents?

  • Have you reviewed the relevant standards applicable to this design?

  • Do you understand the applicable site practices/procedures?

  • Have you consulted with the relevant subject matter experts applicable to this design? ( Construction/Operations/Maintenance)

HAZARD IDENTIFICATION

  • Are there hazards related to construction of the item?

  • Are there hazards related to operating/maintaining the item?

  • Are there hazards associated with the control system?

  • Are there any personnel/plant/equipment hazards?

  • Are there any vehicle/personnel/equipment interaction hazards?

  • Are there any access hazards for vehicles/personnel/equipment?

CONTROL IDENTIFICATION

  • Has the "Hierarchy of Controls" been followed?

  • Have the correct personnel been consulted regarding controls?

  • Have existing procedures been considered/reviewed?

  • Are there any cost/schedule implications relevant to controls?<br>(if YES, follow the "Change Management Procedure")

ASSESS THE RISKS

  • Has the risk score for each hazard been identified?

COMPLETE THE DESIGN WITH ONGOING REVIEW

  • Next planned risk review

HAZARDS AND CONTROLS IDENTIFIED (max 3 per audit sheet)

Hazard 1

  • Hazard description

  • Existing control

  • Existing risk score - refer Risk Assessment Matrix (Low 1 to Extreme 25)

  • Additional control

  • Residual risk score - refer Risk Assessment Matrix (Low 1 to Extreme 25)

  • Hazards and controls identified on which drawings and documents?

Hazard 2

  • Hazard description

  • Existing control

  • Existing risk score - refer Risk Assessment Matrix (Low 1 to Extreme 25)

  • Additional control

  • Residual risk score - refer Risk Assessment Matrix (Low 1 to Extreme 25)

  • Hazards and controls identified on which drawings and documents?

Hazard 3

  • Hazard description

  • Existing control

  • Existing risk score - refer Risk Assessment Matrix (Low 1 to Extreme 25)

  • Additional control

  • Residual risk score - refer Risk Assessment Matrix (Low 1 to Extreme 25)

  • Hazards and controls identified on which drawings and documents?

Actioned

  • Signed off (when completed)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.