Information
-
Site Reference -
-
Document No.
-
Conducted on
-
Prepared by
-
Personnel on Site
General Administration
-
Information & Company documentation displayed
-
Weekly safety inspection available for review?
-
Weekly tool box talk available for review?
-
Near Miss Reports Completed
-
Senior Managers Register completed
-
Signing in register up to date
-
Inductions in place for all employees, Spot check
Safe Systems of Work
-
Risk and Method statements available for Review
Housekeeping
-
Materials and waste stored within designated areas
-
Walkways and passages clear to walk?
-
Projecting nails or screws bent over or removed?
-
Build up of waste on site
Public Protection & Access
-
Site Boundary secure
-
Hoarding in good condition with contact details/signage displayed
Personal Protective Equipment
-
Employees wearing safety footwear
-
Employees wearing Hi Vis vest or jacket
-
Employees wearing hard hats?
-
Spare PPE available for issue
-
Employees using gloves when exposed to cut/chemical hazards?
-
Hearing / Respiratory Protection worn by employees when required?
Electrical
-
Certification in place for temporary power sources
-
Electrical panels and devices labeled and secured?
-
Extension cords in good condition and PAT
-
Trailing Leads
Hand and Power Tools
-
Power Tools free from damage (switches, cords, and guards)?
-
Hand tools free from damage ( shaft, head, splinters, etc.)?
-
Evidence of PAT via register or label
Welfare Provisions
-
Adequate Toilets facilities provided
-
Separate drying room available
-
Hot and cold water available for hand washing
-
Welfare provisions available inclusive of drinking Water
Work at Height equipment (WAH)
-
Correct WAH equipment in use
-
Inspection completed by competent person
-
WAH permit used for alternative equipment
-
Safe area around WAH equipment
Work Place
-
Additional Risk identified
-
-
Scaffolding
-
Handover certificate in place
-
Weekly inspection available for review
-
Gates/Hatches in place at all ladder access points
-
Guardrail,Midrails and Toeboards installed
-
Certification for Lifting equipment supplied
-
Operatives wearing correct PPE during installation
Plant and Equipment
-
Thorough examination certificates for Plant and equipment
-
Operators have training card available to use
-
Daily/weekly check of equipment
Fire
-
Fire extinguisher and means of raising Alarm available and inspected
-
Hot works permit system adhered to?
-
Fire plans and Fire Action Notices displayed
-
Flammable materials stored correctly, removed regularly
Temporary Works
-
Temporary works design available for review?
-
Sign off after installation as per design
-
Monitoring of install temporary works
Review
-
Superintendent signature
-
Safety Director signature