Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
JOB INFORMATION
-
OSHA 300 forms complete and posted from February 1 - April 30?<br>
-
OSHA and DOL posters posted?
-
Emergency phone numbers posted?
-
Jobsite perimeter protection is in place and in good repair?
-
Site Specific Safety Plans filed and in place?
-
SDS filed?
-
Tool box safety talks log up to date?
-
THA's are turned in for each trade daily?
HOUSEKEEPING
-
Work areas neat?
-
Drywall stored flat in rooms?
-
Drywall staged in hallways secured to wall to prevent accidental displacement?
-
Projecting nails or screws bent over or removed?
-
Waste containers provided and used?
-
Passageways and walkways clear?
-
Cords and leads off the floor?
-
Quick hooks used to ensure cord free floors?
FIRE PREVENTION
-
Hot work permits are required for occupied buildings, are they being completed daily?
-
Adequate fire extinguishers are located by stairs, checked and accessible?
-
Phone no. of Fire Department posted?
-
"No Smoking" posted and enforced near flammables?
ELECTRICAL
-
Temporary lighting is in good condition and sufficient to meet the OSHA requirements?
-
Extension wires with bare wires or missing ground prongs taken out of service?
-
Ground fault interrupters being used?
-
Is the electrical subcontractor documenting the monthly GFCI inspections?
-
Terminal boxes equipped with required covers?
-
All knock outs are in place or covered?
HAND, POWER & POWDER ACTUATED TOOLS
-
Hand tools inspected regularly?
-
Guards in place on machines?
-
Correct tool being used for job at hand?
-
Operators of powder actuated tools licensed?
FALL PROTECTION
-
Guardrails, intermediate rails, toe boards and screens in place?
-
Loading areas have Removable rails in place and proper anchorage point?
-
Safety rails and cables secured properly?
-
Safety harnesses worn properly?
-
Employees exposed to fall hazards tied off?
-
Employees below protected from falling objects?
LADDERS
-
Ladders extended at least 36" above landing?
-
Ladders are secure to prevent slipping, sliding or falling?
-
Ladders with split or missing rungs taken out of service?
-
Stepladders used in fully open position?
-
No step at top two rungs of stepladder?
SCAFFOLDING
-
All scaffolding inspected daily?
-
Erected on sound rigid footing?
-
Tied to structure as required?
-
Guardrails, intermediate rails, toe boards and screens in place?
-
Planking is sound and sturdy?
-
Proper access provided?
-
Employees below protected from falling objects?
FLOOR & WALL OPENINGS
-
All floor openings planked over or barricaded?
-
All floor covers are properly secured and marked "Hole"?
-
Perimeter protection in place?
-
Deck planks secure?
-
Materials stored away from edge?
TRENCHES, EXCAVATION & SHORING
-
Daily pre-excavation checklist is complete and has valid digger/JULIE number?
-
Competent person identified and present?
-
Excavations are shored and sloped back?
-
Trench box is no more than 2' off of the bottom of the excavation and is 18" above the ground?
-
Materials are stored at least 2' away from trench?
-
Ladders provided every 25' in trench?
-
Equipment is at a safe distance from edge of trench or excavation?
-
All people near excavation are in high visibility apparel?
MATERIAL HANDLING
-
Materials properly stored or stacked?
-
Employees using proper lifting techniques?
-
Tag lines used to guide loads?
-
Proper number of workers for each operation?
WELDING AND BURNING
-
Gas cylinders stored upright?
-
Proper separating distances between fuels & oxygen?
-
Goggles or shields used?
-
Fire extinguishers readily available?
-
Hoses in good condition?
Construction Equipment
-
Forklift Operators have proper training? Current training card issued?
-
Does heavy equipment have reverse audio alarms in working condition?
CRANES
-
Outriggers extended and swing radius barricade in place?
-
Operator is familiar with load charts?
-
Hand signal charts on crane?
-
Crane operator logs up to date?
-
Employees kept from under suspended loads?
-
Chains and slings inspected and tagged as required?
-
All Walsh workers using rigging have been basic rigger trained?
CONCRETE CONSTRUCTION
-
Rebar caps are in place?
-
Rebar tying stands are stable and in good condition?
-
Decking operations are in compliance for CAZ and fall protection is used when possible?
-
Stripping floors are properly signed and walkways are clear?
-
Nutralite or vinegar is available when pouring concrete?
-
Employees are protected from cement dust?
-
Exposed skin covered?
-
Runways are adequate?
PERSONAL PROTECTIVE EQUIPMENT
-
Hard hats being worn?
-
Safety glasses being worn?
-
Respirators used when required? Proper respirator documentation available?
-
Hearing protection being worn when required?
-
Traffic vests or high visibility clothing material being worn?
Final Comments:
-
Final Comments:
-
Safety Manager
-
Project Manager
-
Superintendent