Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Electrical power

  • Power lines close

  • High voltage signs posted

  • Distance to power line .

  • Is a buffer line in place

Cranes and hoisting

  • Annual inspection current

  • Anti two block device active

  • Boom angle indicator

  • Cert or verify training

  • Crane supported and level

  • Daily inspection current

  • Dist power lines/ de-ener

  • Fire ext in crane

  • Flagman identified

  • Lift plan on file

  • Load chart posted

  • Loads properly secured

  • Means of communication

  • Operator manual in crane

  • Rig insp./rated/

Confine space

  • Entry super/monitor/entrant

  • Is permit required

  • Rescue plan/emerg#'s map

  • Training docs

  • Regular insp./air monitor

  • Harness/extraction equipment

  • Ventilation

  • Electrical/fire prevention

  • Electrical/ fire protection

  • Comm/secure area/ signage

  • Atmospheric conditions

Welding and cutting

  • Bottles upright/cap/secured

  • Flash protection available

  • Torches good condition

  • Weld machine ventilated

  • Leads in good condition

  • Prop PPE in use

  • Gauges working properly

  • Flashback arresters installed on torches

  • Fire Tex. present

Steel erection

  • Anchorage points meet req

  • CDZ training/utilized

  • EE above 30'protected

  • Fall protection training provided

  • Erector notified of modification

  • Falling object protection

  • EE between 15-30' fall protection present

  • Multi lift procedure utilized

  • Multi lift proceed utilized

  • Written approved concrete strength

  • Struct flooring requirements

  • Site layout /sequence plan

  • Proper anchor of columns

Site/public protection

  • Barricades installed properly

  • Company rep present

  • Excavations protected

  • Fall object protected

  • Perimeter fences installed

  • Public protection signage posted

  • Security system in place

  • Street closure identified

  • Traffic control plan

  • Adequate lighting

Scissor/Arial liftsi

  • Equipment loaded properly

  • Gate or chain secured

  • Harness while in boom lifts

  • Nothing to increase height

  • Operating on flat surface

  • Safe working distances

  • Operator training

  • Surfaces free of holes

Scaffolding

  • Bracing and pins in place

  • Compatible components used

  • Planking/toe boards in place

  • Prop secured to structure

  • Proper access to platform

  • Inspected daily

  • Sills,plates,jacks installed

  • Proper loading of material

  • Guardrails in place @6'

  • Safe work distances

  • Working surface in safe condition

PPE

  • All req'd PPE

  • Safe5y glasses

  • Facesheild

  • Gloves

Motorized equipment

  • Flag an used if applicable

  • Glass free of obstructions

  • Seat belts begin used

  • Operator appears competent

  • Training docs available

  • Horn functioning

  • Back up arlarm

Hazard communication

  • Inventory list

  • SDS (site specific)

  • Proper labels on containers

  • Employees trained

  • Copy of program

  • Readily available

Fire protection

  • Fire suppression equip avail

  • Fire watch present

  • Proper signs in stored areas

  • Proper fuel containers

  • Ext.charged and inspected

  • Emergency vehicle

Fall Protection

  • Fall protection at 6

  • Floor/wall openings

  • For covers adequate, secured,labele

  • Fall protection plan

  • Stair/ramp/walkway protected

  • Ext/isn't guardrails

  • Safety harness and lanyard

  • Roof edge protected

Housekeeping

  • Post tension-protection

  • Demolition area of for work protected

  • Clear access to bldg/site

  • Trash being dispose of into the proper containers?

  • Proper access to work arear

  • Material stack neatly

  • Demolition area of structure protected

  • Implement protection

  • Slip,trip,fall hazards

  • Roadway around project clear

  • Walkways cleard

  • Protruding nails removed

  • Proper material storage

  • Proper use of "CAZ" I'd

Hand and power tools

  • Tool in good condition

  • Saw horses used

  • Proper tool for the job

  • Info label on tool

  • Guards in place

  • Ground prong in place

  • Cord in good condition

Ladders/stairways

  • Rails at stairs/landings

  • Slip and trips exposure eliminated

  • Safe work distance from hazards

  • Proper use of ladders

  • Landings and treads filled

  • Ladders secured

  • Clear of debris/materials

  • Extension ladders at 4to 1 pitch

  • Job-bot ladders const correctly

  • Access break >19"

  • 3' above landing

Medical/Emergency

  • 1st Aid/CPR on site

  • 1st aid kit present

  • Map to Medical facility posted

  • Eye wash station in place

  • Emergency numbers posted

  • Emergency prods supplies

  • Emergency action plan in place

  • Team contact numbers

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.