Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Electrical power
-
Power lines close
-
High voltage signs posted
-
Distance to power line .
-
Is a buffer line in place
Cranes and hoisting
-
Annual inspection current
-
Anti two block device active
-
Boom angle indicator
-
Cert or verify training
-
Crane supported and level
-
Daily inspection current
-
Dist power lines/ de-ener
-
Fire ext in crane
-
Flagman identified
-
Lift plan on file
-
Load chart posted
-
Loads properly secured
-
Means of communication
-
Operator manual in crane
-
Rig insp./rated/
Confine space
-
Entry super/monitor/entrant
-
Is permit required
-
Rescue plan/emerg#'s map
-
Training docs
-
Regular insp./air monitor
-
Harness/extraction equipment
-
Ventilation
-
Electrical/fire prevention
-
Electrical/ fire protection
-
Comm/secure area/ signage
-
Atmospheric conditions
Welding and cutting
-
Bottles upright/cap/secured
-
Flash protection available
-
Torches good condition
-
Weld machine ventilated
-
Leads in good condition
-
Prop PPE in use
-
Gauges working properly
-
Flashback arresters installed on torches
-
Fire Tex. present
Steel erection
-
Anchorage points meet req
-
CDZ training/utilized
-
EE above 30'protected
-
Fall protection training provided
-
Erector notified of modification
-
Falling object protection
-
EE between 15-30' fall protection present
-
Multi lift procedure utilized
-
Multi lift proceed utilized
-
Written approved concrete strength
-
Struct flooring requirements
-
Site layout /sequence plan
-
Proper anchor of columns
Site/public protection
-
Barricades installed properly
-
Company rep present
-
Excavations protected
-
Fall object protected
-
Perimeter fences installed
-
Public protection signage posted
-
Security system in place
-
Street closure identified
-
Traffic control plan
-
Adequate lighting
Scissor/Arial liftsi
-
Equipment loaded properly
-
Gate or chain secured
-
Harness while in boom lifts
-
Nothing to increase height
-
Operating on flat surface
-
Safe working distances
-
Operator training
-
Surfaces free of holes
Scaffolding
-
Bracing and pins in place
-
Compatible components used
-
Planking/toe boards in place
-
Prop secured to structure
-
Proper access to platform
-
Inspected daily
-
Sills,plates,jacks installed
-
Proper loading of material
-
Guardrails in place @6'
-
Safe work distances
-
Working surface in safe condition
PPE
-
All req'd PPE
-
Safe5y glasses
-
Facesheild
-
Gloves
Motorized equipment
-
Flag an used if applicable
-
Glass free of obstructions
-
Seat belts begin used
-
Operator appears competent
-
Training docs available
-
Horn functioning
-
Back up arlarm
Hazard communication
-
Inventory list
-
SDS (site specific)
-
Proper labels on containers
-
Employees trained
-
Copy of program
-
Readily available
Fire protection
-
Fire suppression equip avail
-
Fire watch present
-
Proper signs in stored areas
-
Proper fuel containers
-
Ext.charged and inspected
-
Emergency vehicle
Fall Protection
-
Fall protection at 6
-
Floor/wall openings
-
For covers adequate, secured,labele
-
Fall protection plan
-
Stair/ramp/walkway protected
-
Ext/isn't guardrails
-
Safety harness and lanyard
-
Roof edge protected
Housekeeping
-
Post tension-protection
-
Demolition area of for work protected
-
Clear access to bldg/site
-
Trash being dispose of into the proper containers?
-
Proper access to work arear
-
Material stack neatly
-
Demolition area of structure protected
-
Implement protection
-
Slip,trip,fall hazards
-
Roadway around project clear
-
Walkways cleard
-
Protruding nails removed
-
Proper material storage
-
Proper use of "CAZ" I'd
Hand and power tools
-
Tool in good condition
-
Saw horses used
-
Proper tool for the job
-
Info label on tool
-
Guards in place
-
Ground prong in place
-
Cord in good condition
Ladders/stairways
-
Rails at stairs/landings
-
Slip and trips exposure eliminated
-
Safe work distance from hazards
-
Proper use of ladders
-
Landings and treads filled
-
Ladders secured
-
Clear of debris/materials
-
Extension ladders at 4to 1 pitch
-
Job-bot ladders const correctly
-
Access break >19"
-
3' above landing
Medical/Emergency
-
1st Aid/CPR on site
-
1st aid kit present
-
Map to Medical facility posted
-
Eye wash station in place
-
Emergency numbers posted
-
Emergency prods supplies
-
Emergency action plan in place
-
Team contact numbers