Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Job Site Requirements
-
Goodman Safety Program On site
-
SDS On Site
-
Tool Box Talks Complete
-
First Aid Kits On Site
-
Emergency Numbers On Site
-
Accident Reports Available
-
Fire Extinguishers Checked
-
All State and Federal Posters Up
PPE
-
Safety Glasses, Hardhats, Workboots, Gloves, High visibility Vest, in place
-
Respirators Being Used
-
Harness & Lanyards Checked and Stored Properly
-
All Safety Guards for Equipment in Place
Housekeeping
-
Clean Up On A Daily Basis
-
Walkways and Passages Clear
-
All Equipment being Stored And Locked Up At The End of Each Day
Ladders
-
No Aluminum Ladders on Site
-
Extension Ladders 36". Above Landing and Tied Off
-
Ladders Labels Readable
-
Step Ladders Used Properly
-
Only IA Duty Rating of 300 lbs Fiberglass to be Used
-
Ladders Inspected Each Day
-
Ladder Safety Training being done and Documented
Equipment
-
Electrical Cords and Equipment Checked Before Each Shift
-
Check Paint Pumps For Damage and Hoses for Leaks and Cracks
-
Damaged Equipment is Red Tagged and Sent Back To Office
Scaffolds
-
Competent Person On Site
-
Scaffolds Over Six Feet have Fall Protection
-
Out Riggers Being Used for Perry Type Scaffolds That Are two Sections High
-
Wheels on All Scaffolds Being Locked When Workers On Top
-
Scaffolds Not To Be Moved With Worker On Top
-
Green Tags On All Scaffolds When In Use
Fall Protection
-
All Employees Trained on Fall Protection By Competent Person
-
Holes Covered And Marked on Floors
-
Guard rails in Place at Leading Edge and Elevator Doors
-
Clean Up To Prevent Slips and Trips
-
Harness and Lanyards Stored Properly
Hand Tools
-
Powder Actuated Tool Users Have Operator Certificate
-
Chop saw Operators Using Full Face shields
-
Hand Tools Require Cut Resistant Gloves
-
Safety Guards Not To be Removed From Tool
Lifts
-
Trained And Certified Operators Only
-
All Lift Operators Will Be Tied Off To Anchor Point on Lift Using Fullbody Harness And Lanyard
-
No Standing on Guard Rails, Gate Locked, Operator To Be Tied Off Before Starting Machine
-
Check Area Before Moving Lift, for Holes in Floor, Electrical Cords, and Material
-
Operators to Do Pre Start Up For Damage to Machine