Housekeeping
-
-
Material stacked and orderly
-
Debris properly removed (building materials, litter, nails, etc.)
-
Free access/egress maintained
-
Trash cans present in work areas
-
Work areas sanitary
-
Restrooms available near work areas
-
Slip, trip or fall hazards removed
-
Other
Environmental
-
-
Asbestos/Lead present
-
Appropriate training in place
-
Silica dust controlled (if present)
-
Other
Personal Protective Equipment
-
-
Hard Hats
-
Safety Glasses
-
Substantial footwear
-
Appropriate high visibility
-
Gloves
-
Hearing Protection
-
Respirators
-
Face Shields
-
Other
Tools
-
-
Adequate guards in place
-
Tools stored properly
-
Right tools for the job
-
Tools inspected and properly used
-
Other
Electrical
-
-
GFCIs used
-
Cords in good condition and protected from traffic
-
Energized parts protected
-
Proper temporary/task lighting
-
Energy secured, lock out/tag out in place
-
Other
Ladders/stairs
-
-
Ladders secured top and bottom
-
Proper use of ladders
-
Ladders inspected and in good, working order
-
Rails at stairs/landings
-
Clear of debris/materials
-
Slip, trip hazards eliminated
-
Other
Fall Protection
-
-
Fall protection plan signed and understood
-
Predetermined rescue plan in place
-
Fall protection at 4’ on walking/working surfaces, ramps and runways
-
Personal fall protection equipment inspected and in good, working order
-
Guardrail system adequate (floor, wall and roof openings guarded)
-
Anchorage points in place
-
Warning lines in place
-
Overhead protection in place
-
Impalement hazards protected
-
Other
Fire Protection/Hot Work
-
-
Fuel in approved containers and stored properly
-
Fire extinguishers charged and inspected monthly
-
Fire extinguishers immediately available near hot work/adequate number on site
-
Hot work permits completed and posted near hot work areas
-
Combustible materials removed or shielded from hot work areas
-
Appropriate PPE for workers performing welding/torching
-
Other
Framing
-
-
Proper PPE in use (hard hats, safety glasses)
-
Safety devices in place on tools (guards, etc.)
-
Cords in good condition
-
Ladders being used properly
-
No unsafe ramps in use
-
No non rated home-made scaffolds in use
-
Stairs installed prior to sheeting the 2nd floor/loft
-
Guardrails in place on stairways at time of install
-
Guardrails in place at all uninstalled door/window openings (other than garage door)
-
Effective fall protection in place when rolling joists, walking on top plates performing roof work
-
Other
Scaffolds
-
-
Employees trained in the proper use of scaffolds
-
Scaffolding inspected daily and verified by the competent person
-
Guard rails, bracing, mud sills, plates, jack screws and planking installed properly
-
Safe access onto scaffolding
-
Scaffolding adequately secured (if needed)
-
Pump jacks secured properly and base plates pinned
-
Fall protection in use at 10’
-
Other
Mechanized Equipment
-
-
Equipment inspected daily and documented prior to use
-
Owners manual on hand and followed
-
Workers trained
-
Safety devices functioning
-
Seat belts used/chain gates closed
-
Back up alarms audible
-
Spotters used when needed
-
Other
Hoisting/Rigging Equipment
-
-
Operator, Lift Director, Rigger’s and Signal Person’s qualifications on site
-
Crane inspection records maintained and available
-
Rigging inspected prior to use and removed if defective
-
Tag lines in use
-
Pinch/crush areas delineated
-
Power line clearances known and demarcated
-
Other
Excavation
-
-
Competent person designated and on site
-
Workers trained
-
Proper access/egress
-
Spoil pile at least 2' from edge
-
Excavation checked daily and documented
-
Shore/slope/bench (according to soil type)
-
Points of access present every 25' on excavations over 4' deep
-
Other
Confined Spaces
-
-
Component person has verified Permit, Non-Permit or Alternate Entry procedures used
-
Entrants have proper training
-
Permit filled out and posted at entry if needed
-
Air monitoring being performed
-
Adequate ventilation provided
-
Attendant present at permit controlled space with proper training
-
Rescue plan in place
-
Permits closed out daily
-
Other
Site/Public Protection
-
-
Perimeter fenced or demarcated
-
Public protection signage
-
Site secured from unauthorized entry
-
Street closure identified/traffic control plan
-
Adequate lighting
-
Falling object protection
-
Other
Administration
-
-
Worker safety orientations completed
-
Required postings (OSHA 300-A, map to hospitals, emergency contacts, safety bulletin board) posted
-
First aid kit/eye wash station are readily available
-
Weekly safety meeting minutes/attendance roster on file?
-
Weekly site inspection filed and dated?
-
SDS on site
-
A site-specific safety plan has been prepared for this project
-
The site-specific safety plan has been reviewed by Consultant (per the Contractor’s request)
-
Contractor has verified worker training records for work being performed (per the Contractor’s request)
-
Other
Follow up items
-
Other Items
-
Other Photos
-
Outstanding defeciencies
-
Pending corrective actions
-
Auditor signature
-