Title Page
-
Site Name
-
Conducted on
-
Manager on site
-
Position in company
Energy Management Audit
Management Checklist
-
Does site have in place an Energy saving plan in all aspects of the business, Bar, Kitchen, BOH (Office and corridors/store rooms), Cellar, Staff areas and customer toilets.
-
Is the management team aware of this plan
-
Does site have an energy champion in place?
-
Name
-
Does the kitchen have an open/closing energy saving checklist?
-
Does the bar have an open/closing energy saving checklist?
-
What incentives are in place for the staff to get them onboard with your energy saving plan.
Customer Area and Toilets
-
Are all lights front of house LED
-
Has this been logged with pronett, get quotes to see if cost effective.
-
Does site have Heating and Air Con?
-
Heating set no higher than 21 and Air Con no lower than 17
-
Is the Air Con and Heating, programmed to go on and off automatically?
-
Energy Champion to be sent program instructions and set up.
-
Does site have a phone charging station?
-
Is this turned on just before we open?
-
Does site have a photo booth?
-
is this switched on just before opening?
-
KMS screens front of house turned on just before opening?
-
All Non-essential LED and fairly lights turned on at 12pm
-
Have all toilets been fitted with PIR sensors?
-
Has then been logged as a quote on Pronett?
-
Good Practice to only have essential lighting before opening.
BAR AREA
-
Are all bar lights LED
-
Obtain quotes from pronett to see how cost effective this would be in the long run.
-
Beer fonts, are these switched off overnight and then on again at 12pm?
-
Fridge temperatures set to between 4 - 6 degrees
-
Check temperature setting and lower to within range, this saves around £30 of energy a week.
-
Are fridges fans clean and free of debris?
-
Ensure fans and cleaned periodically.
-
All bar lights on for 12pm
-
Ensure bar lights are switched on just before opening to ensure minimal energy consumption when not needed.
-
Does site have any fridges covered with a frosted screen?
-
Can we turn the lights off, as the customer can't see into the fridge
-
Are bottle fridges on timers set to come on at 11:00 and go off at 02:00?
-
Have timers been ordered from Amazon
-
Coffee Machine and Tea Urn switched on 15 minutes before opening?
-
How many card machines does site have
-
Can some of these card machines be left of charge until Thursday and then charged ready for the weekend?
-
Good practice for staff to rinse off bar utensils with cold water within their bar sinks.
BOH (Store rooms, Cellar, Corridors, Team room & Toilets
-
All lighting BOH LED?
-
Log on pronett for quotes.
-
Does the cellar management also have with it python timers, to turn the coolers off overnight when not needed?
-
Log on Pronett to have installed.
-
Cellar fan - is evidence there to suggest this is cleaned periodically.
-
Ensure cellar fan is cleaned periodically and every 6 months a PMV is carried out on it.
-
Does site have ceiling tiles installed in the roof
-
Are all tiles intact and free from damage
-
Does site have a cellar Management system installed?
-
Log on pronett to get one installed.
-
is it set at the correct time off at 02:00 on at 08:00?
-
Glasswash machines turned off at the wall at the end of the night and only 1 in use during quiet periods
-
Can we put this into practice mid week to try and save more energy?
-
Glasswash machines turned on just before opening?
-
Ensure Glasswash machines are turned on just before we open
-
Does site have store fridges BOH?
-
Can these be turned off until the weekend
-
is there evidence that site clean ice machines weekly?
-
Add into weekly cleaning checklist, this will ensure the ice machine is running at its most efficent.
-
Can spare ice machines be turned off during the week.
-
Can we install timers so we minimise the risk of forgetting to turn them back on.
-
Amps switched on at 12pm
-
Computer Screens and CCTV monitors turned off when not in use.
-
Body Cams, once data uploaded are these taken off charge and put back on the day before needed.
-
Door staff radios put on charge the night before they are needed (timer could be installed)
-
Does Site have a second PC in the office
-
Can this turned off if not needed through the midweek
-
Printer switched off overnight?
-
Does site have mobile tills?
-
Are these turned off and taken off charge when at 100%?
-
Once charged and not needed unplug and turn off, mobile tills should only be on when needed and during a Monday so stocks can be counted.
-
Does site have a washing machine and tumble dryer?
-
Ensure these are turned off when not in use.
-
All lights BOH Fitted with PIR sensors, which stay on 15 minutes after being activated.
-
Log job on Pronett to have sensors fitted to existing light fittings
Kitchen
-
Cooking appliances off until 30 minutes before service (unless needed for prep)
-
Extraction system in a good state of repair and working as it should in both cold and warmer times of the year?
-
Log with pronett for an inspection.
-
Can site unplug some microwaves during midweek sessions
-
Can timers be fitted to microwaves to ensure they are off outside of service?
-
Are curtains in use in the Walk in Fridge and freezer?
-
Check all fridges and freezers are set to the correct temperatures.
-
Build up of excessive ice in freezers
-
Add to weekly cleaning list
-
Can the salamander be turned down during quieter sessions?
-
Can sections of the griddle be lowered during the week to save energy?
-
Gas hob off when not in use?
-
Merrychef set to a max temp of 200 degrees
-
Merry chef programming utilised for each item?
-
Program the merry chef to cook each item at the correct temp for the correct time (in minutes) this way it is only on for the time it is needed.
-
Gantry lights (hot plate) only on when food is needed to be kept warm?
-
All cooking equipment (including KMS screens) off at the end of service.
AOB
-
Does site have any questions or outstanding actions from the last audit?