Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
X=Not applicablr 0=Non-compliance 1=insufficient 2=acceptable 3=excellent
-
Scaffold has been inspected by a competent person for that shift.
-
Add media
-
Scaffold has proper ladder access.
-
Add media
-
Scaffold platform is fully planked (.451 B1).
-
Add media
-
Platform is free of excess tools, material or debris.
-
Add media
-
Scaffold is equipped with toe boards if required.
-
Add media
-
Scaffold is not being used as anchor point.
-
Add media
-
Scaffold is fully enclosed or 100% tie off is being used.
-
Add media
-
Scaffolds are 10' from power lines.
-
Add media
-
If any part of the scaffold is damaged it is tagged out and taken out of service.
-
Add media