Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Client/Customer:
Handover Information
-
Description of Section Handed Over:
-
Drawing Number:
-
Type of Ties:
-
Number of Ties:
-
Number of Ties Tested:
-
Use only for:
-
Loading to be (kN/M2):
-
Date and time sent:
-
Signature on Behalf of the Scaffolding Contractor: