Title Page
-
Site Name
-
Job Number
-
Site Location
-
Site Manager
-
Client
-
Inspection completed by
-
Date of inspection
Scaffold Inspection
-
Scaffolding Check Guide
-
Inspection Type
- First Use
- Following 7 days of use
- Following adverse weather conditions
- Following any alterations
-
Scaffold Erected by
- William Waugh & Sons (Builders) Ltd
- Others (Details in notes)
-
Location Of Inspected Scaffold
- Full
- Front
- Rear
- Gable
- Gable Lift
- Left Side
- Right Side
- Front Roof Access
- Rear Roof Access
- Ground Level Lift
- Other
-
If Other, please specify location
-
Are The Footings Suitable ?
-
Fault
- Ground Soft and Uneven
- No Base Plates
- No Sole Boards
- Scaffold Undermined
- Damaged Base Boards
- Other (Details in notes)
-
Image
-
Are The Standards Suitable ?
-
Fault
- Incorrect Bay Centers
- Standards Not Plumb
- Joints Not Staggered
- Material Damaged
- Loose/Incorrect Fittings
- Other (Details in notes)
-
Image
-
Are The Ledgers Suitable ?
-
Fault
- Ledgers Not Level
- Joints Not Staggered
- Loose Fittings
- Material Damaged
- Incorrect Fittings
- Other (Details in Notes)
-
Image
-
Is The Bracing Suitable ?
-
Fault
- Loose
- Missing
- Incorrect Fittings Used
- More Than 300mm From Node Point
- Incorrect Frequencies
- Other (Details in Notes)
-
Image
-
Are The Transoms Suitable ?
-
Fault
- Incorrect Spacing
- Incorrect Fittings
- Incorrectly Supported Inside Boards
- Inside Boards Not Secured (where required)
- Other (Details in Notes)
-
Image
-
Are The Fittings Suitable?
-
Fault
- Wrong Type Used
- Damaged
- Loose
- Supplementary Couplers Missing
- Other (Details in Notes)
-
Image
-
Are The Couplings & Clips Suitable ?
-
Notes
-
Image
-
Are The Bridles Suitable ?
-
Notes
-
Image
-
Are The Ties Suitable ?
-
Fault
- Incorrect Number/Layout
- Ties Not Tested
- Ties Loose
- Raker Configuration Incorrect
- More Than 300mm From Node Point
- Other (Details in Notes)
-
Image
-
Are The Boards/Planks Suitable ?
-
Fault
- Incorrectly Supported
- Incomplete Platforms
- Gaps in Boards
- Not Tied Down (where required)
- Damaged Boards
- Overlapping Boards
- Notched Boards
- Other (Details in Notes)
-
Image
-
Are Gates and Hatches Suitable ?
-
Notes
-
Image
-
Are Ladders Suitable ?
-
Fault
- Poor Condition
- Incorrect Length
- Incorrect Angle
- Unsecured
- Unprotected Openings
- External Ladder - Extends Over Two Lifts
- Other (Details in Notes)
-
Image
-
Are Guardrails/Toeboards Suitable?
-
Fault
- Guardrail Below 950mm
- Gap Between Guardrails Exceed 470mm
- Safety Gates Missing
- Missing Guardrails/Toeboards
- Working Lifts - Double Guardrails Missing
- Non-Working Lifts - Single Guardrails Missing
- Internal Guardrails/Toeboards Missing (where required)
- Other (Details in Notes)
-
Image
-
Are Platforms Suitable?
-
Fault
- Lift Height Too Big/Small
- Widths Incorrect
- Excessive Gaps (In Excess of 25mm)
- Foot Kicker Lift Missing (where required)
- Excessive Gap Between The Platform and The Workface.
- Other (Details in Notes)
-
Image
Summary Of Inspection
-
General Notes And Summary Of Findings
-
Are There Any Recommendations Identified ?
-
Recommendations
-
Image
-
Is The ScafTag Present and Signed ?
-
Image
Inspection Sign Off
-
Add signature