Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Scaffolds designed by a qualified person?
-
Scaffolds are capable of supporting 4x the intended load?
-
Competent person supervised erection of scaffold?
-
Casters are proper size and locking mechanism functioning correctly?
-
Supporting surface is level and solid with no settling?
-
Scaffold frames plumb and braced?
-
All brace connections secured?
-
Diagonal braces or hood planks used to prevent racking?
-
Platforms on all working levels fully decked?
-
Each platform at least 18" wide?
-
Ends of platforms cleated or a minimum of 6" past support?
-
Wallboards overlap over support with at least 12" of overlap?
-
Ladders are provided to access scaffold platform?
-
Guardrails in place where workers could fall 10' or more?
-
Guardrails in place and can support 200lb?
-
Top rail is between 38" - 45" with mid rail midway between top rail and platform?
-
Toe boards, screens or barricades are in place when objects could fall from scaffold platforms?
-
Scaffolds stacked more than 4x the minimum base width are tied, guyed or braced to prevent tipping.
-
Scaffold is erected at least 10' from electrical power lines?
-
Workers are not riding scaffold if height is more than 2x the minimum base width?
-
Force to move scaffold is within 5' of floor?
-
Workers are locking scaffold when worker is using in stationary position?
-
Employees trained before working on scaffold?