Information
Inspection Details:
-
Site Name:
-
Job Number:
-
Inspected By:
-
Date:
General Description:
-
Erected by
-
Double/Single
- Double
- Single
-
Type
- Aluminium
- GRP
-
Height in meters
Untitled Page
-
Are the castors or base plates in contact with the ground and bearing their share of the weight of the tower and that all four breaks are applied?
-
Are the adjustable legs only being used to level the tower and not for gaining height?
-
Is the tower level in all planes?
-
Is the tower built on firm and stable ground?
-
Are stabilisers fitted and are they the correct size for the height of the tower?
-
Check that the feet are fully in contact with the ground, and wing nuts are tight?
-
Check that the foot of the stabilisers are positioned to form a square?
-
Is the bracing pattern used, in accordance with the manufactures instructions?
-
Check that the hooks on the braces are fully engaged?
-
Check that all the handrails and mid guards are fitted in the correct positions?
-
Check that all the handrails and mid guards are fitted in the correct positions?
-
Check that the interlocking device, locking frames together are engaged?
-
Check that all platforms are in the correct position on the tower?
-
Check that the trap door opens to the outboard side of the tower?
-
Is the working platform at least 600mm wide?
-
Check that, if the tower is single width, that all platforms have trap doors?
-
If wind locks are fitted to the platform, check that they are engaged?
-
Are toe boards fitted to the working platform, or any platform with gear stowed?
-
Is the Mobile Tower Scaffold to be erected at least four meters away from any overhead power lines?
-
If necessary, has the work area been cordoned off?
Sign Off
Inspection Completed - Sign off
-
Name / signature of inspector
-
Photo of Tower
-
Your location can be autofilled here (for speed, good signal required) this will not be as accurate as manually completing the address
-
Link to HSE website for Towers
http://www.hse.gov.uk/construction/safetytopics/scaffold.htm