Title Page
-
Project address
-
Client
-
Elevation (N,S,E,W)
-
Conducted on
-
Prepared by
-
Location
-
Are all parts of the scaffold at least 3m away from unprotected power lines
-
Is the scaffold erected a safe distance away from trenches or excavations
-
Is the ground/substrate suitable for scaffold construction
Scaff tags/access and egress
-
Are scaff tags visible at all access and egress points
-
Is scaffold equiped with ladder access to all working platforms
Scaffold structure
-
Are all screwjacks/feet set upon baseplates
-
Are all standards/screwjacks bearing firmly (not floating)
-
does the scaffold feel stable
-
Are guardrails installed everywhere necessary
-
Are there sufficient wall ties
-
have wall ties been removed by others
-
Are diagonal braces installed everywhere necessary
Working platforms
-
Are working platforms installed at all necessary working areas
-
Are the working platforms suitable for their intended purpose.
-
Are all working platforms fully decked and free from unsafe gaps.
-
Are toe boards or debris nets installed to prevent materials falling from working platforms.
Netting and tarping
-
If a roof structure is installed is it in good working order
-
If scaffold is tarped, is the tarp in good working order
-
If scaffold has debris net, is the net in good working order
General notes
-
Are there any areas of concern that should be noted.
Current condition
-
is the scaffold currently safe for its intended use.
signature
-
Please sign