Title Page
-
Conducted on
-
Prepared by
-
Installation Team Details. Sub-contractor Name
-
Location/ Name of Site
-
Works carried out
-
Materials storage
-
Is scaffold present on site?
-
Scaffold components, planking/decking in good condition?
-
Scaffold is level and plumb?
-
Are the ground conditions suitable for the scaffold installation ?
-
Are there any open excavations around the scaffold?
-
Guard railing in place on all open sides and ends?
-
Area around scaffold has been secured/cornered off?
-
Are toe boards properly installed when required?
-
Proper access to get on and off the scaffold? Ladder <br>secured in place?
-
Scaffold control tag has been signed and dated?
-
Is the scaffold clean and materials stored within the capacity of the scaffold?
-
Have double boards and sheeting been installed over pedestrian and entry/exit areas?
-
Scaffold secured to structure to prevent movement?
-