Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Scaffold
-
Sub base in good condition?
-
Sole plates in place?
-
Adjustable jacks/base plates?
-
Caster wheels (with brakes)
-
Engineers certificates on record?
-
Unused components correctly stored
-
Mesh to access stairs
-
Planks (full decks)
-
Required permits on record
-
Toe boards installed
-
Handrails installed
-
Mesh guards installed
-
Access provided (ladders etc)
-
Ladder secured
-
Access stairs with handrails
-
Scaffold tag displayed
-
Scaffold clean/clear for access
Scaffolder inspection
-
Correct number of work platforms
-
Ties
-
Diagonal, transverse and plan bracing
-
Planks lapped to regs
-
Correct distance from electrical (to regs)
-
Diagonal bracing
-
Correct distance from workface
-
Scaffold not overloaded
-
Ticketed scaffolders
FALSEWORK INSPECTION CHECKLIST (as for scaffolding plus)
-
Engineers report
-
Vertical and horizontal loading safety factors incorporated
-
Calculations and design criteria (recorded)
-
Sure lock pins in all frames
-
Pins in all props
-
Extension on U-heads and jacks within limits
-
All components free from patent defects<br> i) straight<br> ii) not overly pitted<br> iii) not overly rusted