Information
-
Client / Address
-
Prepared By
-
Conducted on
Design Drawings.
-
Has the scaffold been erected in accordance with the design provided?
-
Are Designs Available for structures that are non standard?
Footings.
-
Is the ground suitable to take the imposed loads of the scaffold?
-
Have base plates and sole boards been fitted and are they all in a good condition with no defects?
Standards & Legers.
-
Are all the standards and Ledgers correctly plum or level within the allowed tolerance?
-
Are all standards and ledger joints staggered?
-
Are the lift heights and bay sizes compliant with table 1 of TG20:13
Transoms
-
Are the lengths of all transoms sufficient?
-
Is there a transom fitted within 300mm of the node point at ledger braced pairs of standards?
-
Are the spacings of transoms correct on boarded and non boarded lifts?
Ledger, facade and plan bracing.
-
Is all bracing connected within 300mm of the node point?
-
Is bracing connected at the correct intervals with suitable sized tube?
-
Is all bracing connected via load bearing fittings?
Fittings.
-
Are all fittings in a suitable condition?
Ties.
-
Have preliminary pull tests been carried out?
-
Have proof pull tests been carried out?
-
Are all ties connected at the correct intervals and have tie tags where applicable?
Boarded lift.
-
Are all scaffold boards in a good condition with no defects (gaps, notches, splits etc.)?
-
Are there any gaps in the working platform due to missing scaffold boards?
-
Are all boards that are 8ft and under suitably secured?
-
Do all standards project a minimum of 1m through the lift?
-
Are all inside boards suitably secured?
-
Have all projecting tubes been kept to a minimum and protective caps fitted?
Handrails, toe boards & Brick guards.
-
Are handrails and toe boards fitted where there is a risk of persons or materials falling?
-
Are handrails and toe boards joined correctly, at the correct height and secure?
-
Are brick guards in a good condition and suitably secured?
-
Is there a requirement for debris netting or mono flex and is it fitted correctly?
Ladder/stair access, scaff tags and signage.
-
Are ladder gates / trap doors installed where there is a risk of falling from height?
-
Are the ladders in good condition, the correct length, fitted at the correct angle and securely fixed in place?
-
Are scaff tags located at all access points of the scaffold?
-
Is all the necessary signage on display?
Rubbish chutes?
-
Are rubbish chutes fitted correctly and at suitable intervals?
Housekeeping.
-
Are all spare scaffold components removed from the handed over scaffold?
-
Is the scaffold kept in a clean and tidy condition?
-
Are all scaffold component stored in a neat and tidy condition?
SG4:15
-
Does the scaffold appear to have been erected in accordance with SG4:15?
-
Is all collective fall prevention equipment in a good condition?
-
Is all personal fall prevention equipment in a good condition?
Other comments
-
Other comments
Previous inspection - Closed Out
-
Previous inspection - Closed Out
Sign off
-
Project/Site Manager Signature
-
Auditors signature