Information

  • Rilmac standard form no.

  • Inspection no.

  • Title

  • Client & Site

  • Conducted on

  • Prepared by & Position.

  • Personnel on site

Design Drawings.

  • Are Designs Available for structures that are non standard?

  • Has the scaffold been erected in accordance with the design provided?

Footings.

  • Are the footings provided by the client Suitable for their intended purpose?

  • Is the ground suitable to take the imposed loads of the scaffold?

Standards & Legers.

  • Are all the standards and Ledgers correctly plum or level within the allowed tolerance?

  • Are all joints staggered?

  • Are the lift heights and bay sizes compliant with table 1 of TG20?

Transoms

  • Are the lengths of all transoms sufficient?

  • Is there a transom fitted within 300mm of the node point at ledger braced pairs of standards?

  • Are the spacings of transforms correct on boarded and non boarded lifts?

Ledger, facade and plan bracing.

  • Is all bracing connected within 300mm of the node point?

  • Is bracing connected at the correct intervals with suitable sized tube?

  • Is all bracing connected via load bearing fittings?

Fittings.

  • Are all fittings in a suitable condition?

Ties.

  • Are all ties connected at the correct intervals and have tie tags where applicable?

  • Have preliminary pull tests been carried out?

  • Have proof pull tests been carried out?

Boarded lift.

  • Are there excessive materials left on the boarded lift?

  • Are there any gaps or notches in the boards?

  • Are all boards that are 8ft and under suitably secured?

  • Do all standards project a minimum of 1m through the lift?

  • Are all inside boards suitably secured?

Handrails, toe boards & Brick guards.

  • Are handrails and toe boards fitted where there is a risk of persons or materials falling?

  • Are handrails and toe boards joined correctly and at the correct height?

  • Are brick guards in a good condition and suitably secured?

  • Is there a requirement for debris netting or mono flex and is it fitted correctly?

Ladder/stair access, scaff tags and signage.

  • Is the means of access suitable according to client spec and ideally located including doorway access?

  • Are scaff tags located at all access points of the scaffold?

  • Is all the necessary signage on display?

Rubbish chutes?

  • Are rubbish chutes fitted correctly and at suitable intervals?

Housekeeping.

  • Are all spare materials in a neat and tidy condition?

  • Is there a suitable lay down area and is it in a tidy condition?

SG4:10

  • Does the scaffold appear to have been erected in accordance with SG4:10?

  • Is all collective fall prevention equipment in a good condition?

  • Is all personal fall prevention equipment in a good condition?

Projecting tubes.

  • Have all projecting tubes been kept to a minimum and protective caps fitted?

Summary.

  • Please provide a summary and an overall score for this inspection.

  • Inspector.

  • Site representative.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.