Title Page
-
Site name
-
Site number
-
Site post code
-
Conducted on
-
Prepared by
Information
-
AV360
-
AV360 T gantry
-
AV400
-
Promote standard
-
Promote Plus/ IO lite
-
MVPC
-
Switch Connections
Kit Installed
-
Have HDMI cables been installed on this visit
-
Have the HDMI cables been labelled
-
Have the HDMI's been plugged into the screens on source 2 (as long as it is on the side of the screen)
-
Were any 5m HDMI leads installed
-
How many were installed
-
Were any 10m fibre HDMI leads installed
-
How many were installed
-
Asset numbers for HDMI cables installed
-
Were any 15m fibre HDMI leads installed
-
How many were installed
-
Asset numbers for HDMI cables installed
-
Were any 20m fibre HDMI leads installed
-
How many were installed
-
Asset numbers for HDMI cables installed
-
Were any 30m fibre HDMI leads installed
-
How many were installed
-
Asset numbers for HDMI cables installed
-
Have HDMI splitters been installed
-
How many 2 way splitters were installed
-
How many 4 way splitters were installed
-
Have any HDMI to DVI adapters been installed
-
How many adapters been installed
-
Have the Amino boxes been installed on this visit
-
Were the Amino boxes installed in the rack or AV press
-
How many rack shelves were installed
-
How many Amino boxes were installed
-
Have the Amino boxes been labelled up
-
Asset Numbers of Amino boxes
-
Asset number of Netgear switch
-
How many 1m CAT5 cables were installed
-
How many 3m CAT5 cables were installed
-
Picture of Rack/ AV press from a distance
-
Picture of Switch in situ
-
Picture of Amino boxes in situ
-
Picture of main gantry
-
Picture of EP screen
-
Picture of Bingo screen
-
Picture of Results screen (if required)
-
Picture of Virtual racing screen
-
Picture of Virtual Cricket screen
-
Picture of SSBT screen (if required)
-
Any additional screens
-
Do the SIS receivers need to be replaced
-
How many have been replaced
-
Old receiver asset number
-
Old receiver UA number
-
Cisco receiver asset number
-
Cisco UA number
-
Has the receiver been authorised
-
Old receiver 1 asset number
-
Old receiver 1 UA number
-
Cisco receiver 1 asset number
-
Cisco 1 UA number
-
Has the receiver 1 been authorised
-
Old receiver 2 asset number
-
Old receiver 2 UA number
-
Cisco receiver 2 asset number
-
Cisco 2 UA number
-
Has the receiver been authorised
-
Have the affected screens been changed to switch on to the correct HDMI port on start up
-
Has a gantry power cycle been carried out and screens start up on correct source
Derigged equipment
-
Has the existing Hardware been removed (receivers and PC's)
PPTV1 Receiver
-
Was the receiver working on arrival
-
PPTV1 asset number
-
PPTV1 UA number
PPTV2 Receiver
-
Was the receiver working on arrival
-
Receiver model
-
Asset number
-
UA number
PPTV3 Receiver
-
Was the receiver working on arrival
-
Receiver model
-
Asset number
-
UA number
PC's removed
-
Was the MVPC working on arrival
-
MVPC asset number
-
MVPC service tag number
-
Was a SVPC removed
-
How many SVPC's were removed
-
Was the SVPC working on arrival
-
SVPC asset number
-
SVPC service tag number
-
Was the SVPC 1 working on arrival
-
SVPC 1 asset number
-
SVPC 1 service tag number
-
Was the SVPC 2 working on arrival
-
SVPC 2 asset number
-
SVPC 2 service tag number
-
Has the RF equipment been removed
-
Is there a QPSK onsite and if so was it removed
-
Asset number of unit
-
Serial Number of Unit
-
Is there a AtoB (multiview box) onsite and if so was it removed
-
Asset number of unit
-
Serial Number of Unit
-
Is there a ZEEVEE onsite and if so was it removed
-
Asset number of unit
-
Serial Number of Unit
-
Was a visiodata amp removed
-
Have all the modulators and splitters been removed
-
Picture of rack/ AV press with equipment removed
-
Explain why the equipment was not removed
-
Picture evidence of why equipment can't be removed
Additional Information
Any outstanding issues onsite
-
Are any screens showing issues onsite (backlight issues)
-
Which screens are showing backlight issues
-
Picture of screens showing backlight issue
-
Have staff reported any other issues
-
What have staff reported
Additional information
-
Any additional comments/ remedial works
-
Any additional photos
Sign off
Client
-
Client/Site Contact Name
-
Client/Site Contact Position
-
Client/Site Contact Signature
Engineer
-
Engineer Name
-
Engineer signature